Connecting An Ac Output Power Cable - Huawei SUN2000-100KTL Series User Manual

Hide thumbs Also See for SUN2000-100KTL Series:
Table of Contents

Advertisement

SUN2000-(100KTL, 110KTL, 125KTL) Series
User Manual

5.6 Connecting an AC Output Power Cable

Prerequisites
Do not connect loads between the solar inverter and the AC switch.
Requirements for the OT/DT Terminal
Issue 07 (2020-09-15)
A three-phase AC switch should be installed on the AC side of the solar
inverter. To ensure that the solar inverter can safely disconnect itself from the
power grid when an exception occurs, select a proper overcurrent protection
device in compliance with local power distribution regulations.
Connect the AC output power cable according to the requirements specified
by local power grid operators.
Connect the power cable of the tracking system before the AC output power
cable. Otherwise, reworking will be caused.
Figure 5-12 Cable connection sequence
(1) Power cable of the tracking system
WARNING
If a copper cable is used, use copper wiring terminals.
If a copper-clad aluminum cable is used, use copper wiring terminals.
If an aluminum alloy cable is used, use copper-aluminum transition wiring
terminals, or aluminum wiring terminals along with copper-aluminum
transition spacers.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
(2) AC output power cable
54

Hide quick links:

Advertisement