Wall-Mounted Installation - Huawei SUN2000-100KTL Series User Manual

Hide thumbs Also See for SUN2000-100KTL Series:
Table of Contents

Advertisement

SUN2000-(100KTL, 110KTL, 125KTL) Series
User Manual
Step 2 Drill holes using a hammer drill. It is recommended that anti-rust measures be
taken on the positions for drilling holes.
Step 3 Secure the mounting bracket.
Figure 4-10 Installing the mounting bracket
----End

4.4.2 Wall-mounted Installation

Prerequisites
You have prepared expansion bolts. M12x60 stainless steel expansion bolts are
recommended.
Procedure
Step 1 Determine the positions for drilling holes using the mounting bracket. Level the
positions of mounting holes using a bubble or digital level, and mark the positions
with a marker.
Step 2 Drill holes using a hammer drill and install expansion bolts.
Avoid drilling holes in the position of the wall with water pipes and power cables
buried inside.
Issue 07 (2020-09-15)
WARNING
Copyright © Huawei Technologies Co., Ltd.
4 Installation
32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents