Unpacking and Placing the Unit

5. Unpacking and Placing the Unit

Q96 type
DO NOT USE STANDS TO SUPPORT THE CORNERS
CAUTION
1. Prepare a water drainage channel around the foundation to condensate waste water from
2. If the unit is to be installed on a roof, check the strength of the roof and its drainage facilities
3. If the unit is to be installed on a frame, install the waterproofing board within a distance of 5 7/8"
144
Make sure the unit is installed level on a sufficiently strong base to prevent vibration and noise.
Secure the unit to its base using foundation bolts. (Use four commercially available M12-type
foundation bolts, nuts, and washers.)
The foundation bolts should be inserted 13/16".
Make sure the base under the unit extended more than 30 1/8" behind the unit.
The height of the base should be at least 5 7/8" from the floor.
The unit must be installed on a solid longitudinal foundation (steelbeam frame or concrete) as
indicated in figure 4.
A
B
3
Model
A (in.)
48 13/16
1
around the unit.
first.
under the unit in order to prevent infiltration of water coming from under the unit.
1
1. Foundation bolt point (φ9/16" dia. : 4 positions)
2. Depth of product
2
3. Shape of outdoor unit's support leg and foundation
bolt positions
(in.)
B (in.)
43 3/8
1. Do not use stands to support the corners.