Hand Over to Customer

6.

Hand Over to Customer

6.1

Operational Steps

Important Points
a) The measurements taken during the test run should be recorded and kept on a test run
b) Do not forget to record the length of the refrigerant piping and the refrigerant additional
c) Explain to the customer how to operate the equipment and let him try it.
d) Assemble all the relevant diagrams and other printed matter which is required to operate the
e) Make the service contact address clear.
98
Make final report
Complete test run
(test run
inspection sheet)
inspection sheet.
charging volume on the plate on the back of the outdoor unit external notice board, as this
information will be required for servicing the system.
system and hand it all over to the customer (on the spot) and tell him to keep it.
Explain how to
Hand over
operate
relevant printed
equipment
materials
Si39-406
(V1050)
General Information