3.2.4
Preparation for Installation
Installation Space
Secure sufficient working space for easy operation, cleaning, maintenance, and inspection.
Illumination
Prepare illumination devices which allow easy operation, cleaning, maintenance, and inspection.
Ventilation
If natural ventilation is insufficient, install ventilation fans according to the relevant regulations.
Piping
Item
Suction gas inlet
Low-stage gas outlet
High-stage gas inlet
High-stage discharge gas outlet
Lubrication oil supply port for low-stage
bearing (journal)
Lubrication oil supply port for low-stage
capacity control (increased side)
Lubrication oil supply port for low-stage
capacity control (decreased side)
Oil supply port for oil injection
Lubrication oil supply port for high-stage
bearing (journal)
Lubrication oil supply port for high-stage
capacity control (increased side)
Lubrication oil supply port for high-stage
capacity control (decreased side)
15A
20A
25A
80A
100A
150A
Compound 2-stage Screw Compressor 2016**C
Table 3-1 List of Connecting Pipes (Compressor)
D
t
□
74
5
□
84
5
□
100
5
200
5
225
5
305
5
Figure 3-2 Dimensions of the Joint
Dimensions
JIS 20K 150A (6")
JIS 20K 100A (4")
JIS 20K 100A (4")
JIS 20K 80A (3")
JIS 20K 25A (1")
Rc1/4
Rc3/8
JIS 20K 15A (1/2")
JIS 20K 20A (3/4")
Rc3/8
Rc1/4
g
C
N-h
43
70
4-M12
51
75
4-M12
61
90
4-M16
121
160
8-M20
146
185
8-M20
216
260
12-M22
3-4
2200LZJE-HO-C6-N_2013.12.
Chapter 3 Installation
Remarks
See Figure 3-2.
See Figure 3-2.
See Figure 3-2.
See Figure 3-2.
y
25
25
25
35
35
34
3.2 Installation Works