Preparing For Piling The Stones; Image 2 Preparing For Piling The Stones - Helo Rocher DET Installation And User Manual

Electric sauna heater
Hide thumbs Also See for Rocher DET:
Table of Contents

Advertisement

7
Installation and User Manual ROCHER DET

2.9. Preparing for piling the stones

Removing of the supporting bars to pile the stones
Unscrew the bars' mounting screws (2 pcs).
Lift the support bar's locking plate up from its
normal position.
Lift off the support bars.
Pile stones up to the Helo marker.
Reinstall the support bars.
Install the support bars as above in the reversed order.
Pile the stones so that they cover the heating elements.
For specific instructions refer to section 2.4 Sauna heater stones.
Image 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1118-701-0405181118-1051-0405181601-27

Table of Contents