Duct Cover Installation - Fisher & Paykel HCB30-6 Installation Preparation

Table of Contents

Advertisement

Duct Cover Installation

1. Place the duct cover on the range hood.
2. From inside of range hood, insert the 5/16" (8mm) T20 (TORX) head machine screws through the 4 holes
in the duct cover (refer to A).
Multiple duct covers can be used if additional height is required. Duct covers are available in 6"
(152mm) and 12" (305mm) heights. Screw the duct covers together before placing them onto the
range hood and completing step 2.
Duct Transition
• The range hood is supplied with individual duct connection rings that connect to 8" (208mm) ducting, (refer to B).
• An optional transition may be ordered separately, please refer to 'Parts and accessories' for details. This can be
mounted to the top of the range hood to provide a single 10" (254mm) outlet.
• For wall mounting installation the transition should be installed before the range hood is mounted.
• For cabinet mounting installation the transition should be mounted after installing the range hood.
https://producthelp.fisherpaykel.com/us/Cook/Ventilation/Wall_Canopy/HCB36-6_N/User_Guide_HCB36-6_N/04_Installation_...
Updated: Thu, 01 Oct 2020 16:50:17 GMT
Powered by
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcb36-6Hcb36-12Hc36Hcb48-12Hc48

Table of Contents