Commissioning and diagnostics
4.2

Commissioning and starting

Software requirements
Configuration software
used
Configuration software
for the AS–i master used

Table 4-2: Software requirements for commissioning

Requirements for commissioning
Action assumed to have been taken
1. Motor starter installed
2. Address set on the motor starter
3. Supply voltage for the motor starter switched on
4. If appropriate, supply voltage for the load switched on
5. Motor starter configured and parameterized
6. Supply voltage for AS-i master switched on
7. AS-i master switched to RUN operating state

Table 4-3: Requirements for commissioning

Testing the wiring from the motor starter to the motor
With the aid of the addressing and diagnostic unit (Order No.: 3RK1 904-
2AB00) you can test the wiring from the motor starter to the motor via the
addressing socket without a PLC by setting the corresponding outputs:
Outputs
DO- 0. 0
1
2
3

Table 4-4: Testing the wiring from the motor starter to the motor

Further information is provided in the operating instructions for the
addressing and diagnostic unit.
4-4
(See AS-i master manual)
Control commands (PLC to motor starter)
Motor CW
Motor CCW
Brake
Trip reset
Explanations
Further information: see ...
Installation chapter
Installation chapter
AS-i master manual
[1]: ON
[0]: OFF
[1]: ON
[0]: OFF
[1]: ON
[0]: OFF
[0] –> [1]: ACTIVE
[0], [1]: NOT ACTIVE
ECOFAST Motor Starters
GWA 4NEB 950 0562-12
1
0