IBM 5280 User's Setup Procedures page 3

Distributed data system
Hide thumbs Also See for 5280:
Table of Contents

Advertisement

This manual is divided into ten sections. Section 1
provides information about what should have been done
prior to setup. Sections 2 through 6 provide procedures
for setting up the 5281, 5282, 5286, 5285, and 5288
respectively.
Section 7 provides the procedures for labeling the
system. Section 8 provides a procedure for running the
verification program. The program checks the devices
after you have set them up. Section 9 presents the
procedures for connecting the communications lines to
the 5280 system. Section 10 provides general
instructions for disconnecting and relocating your
system.
Preface
The tabs on the side of the manual indicate the name of
the procedure in each section.
This manual should be used after your devices are
unpacked and placed where you intend to use them.
When you have finished setting up and verifying the 5280
system, save one of the User's Setup Procedures manuals
by placing it in the Machine Verification binder.
Preface
iii

Advertisement

Table of Contents
loading

Table of Contents