Scheduled Maintenance - Bardiani Valvole BBZO Instruction, Use And Maintenance Manual

Single seat tank bottom valve
Table of Contents

Advertisement

10

Scheduled maintenance

10 Scheduled maintenance
SCHEDULED MAINTENANCE
VALVE GASKETS
ACTUATOR GASKETS
Preventive
Replace after 12 months
Replace after 24 months
In the event of leaks
Replace at the end of the day
Replace in the event of leaks
Check correct operation and
Check correct operation and
that there are no leaks
that there are no leaks
Periodical
Record the actions carried out
Record the actions carried out
21