Step 4 - Installing The Chassis 7 And Reconnecting Field Wires; Step 5 - Installing The Transformer - HydroPoint WeatherTRAK Chassis 7 Installation Manual

Table of Contents

Advertisement

WeatherTRAK Chassis 7 Installation Guide
Apply a liberal amount of silicone sealant (3M™ Clear Super Silicone 08661, or equivalent)
to the underside of the pancake antenna before inserting into the hole.
Note: Failure to apply silicone sealant to provide a weather-resistant seal may result in
leakage and possible product damage which is not covered under the WeatherTRAK
warranty.
Hand-tighten the locknut to confirm the pancake antenna is properly seated and sealed,
and then tighten with an adjustable wrench.

Step 4 - Installing the Chassis 7 and Reconnecting Field Wires

Install the Chassis 7 within the lower portion of the pedestal enclosure. Align the mounting
holes with the interior threaded studs and secure with the 4 locknuts and 4 integral lock
washers. Tighten with a socket or adjustable wrench.
Reconnect all of the existing field wire and sensor wires to the corresponding station
outputs or inputs as needed. Splice any short field wires with butt connectors or industry
recognized wire nuts as needed.

Step 5 - Installing the Transformer

Insert the threaded stud of the transformer into the thru-hole. Thread one of two locknuts
onto the threaded nipple of the transformer and tighten securely.
Install the metal junction box and thread a second locknut. Tighten the second locknut to
secure the junction box. See the illustration below.
©2018 HydroPoint Data Systems Inc. All rights reserved.
5
800.362.8774 • hydropoint.com

Advertisement

Table of Contents
loading

Table of Contents