Woods BATWING BW20.50Q Operator's Manual page 54

Rotary cutter
Table of Contents

Advertisement

REF PART
QTY
A
1019456
-
Winch kit, complete
1
52478
4
Idler bracket
2
6696
2
Chain idler casting
3
409
2
Clevis pin, 1/2 x 2
4
22411
2
Klik pin, 3/16 x 1
5
3379 *
-
HHCS, 1/2 NC x 1-1/2 GR5
6
11900 *
-
Lock nut, 1/2 NC flanged
7
1863 *
-
Washer, 1" SAE flat
8
1008325
2
Headless pin, 1 x 4 drilled
9
1266 *
-
Cotter pin, 3/16 x 1-1/2
10 1027150
2
Channel. .25 x 2.56 x 2.75 x 38.48
11 1027199
1
Channel, 3.12 x 3.25 x 10.00
12
12612
1
Gear winch 5.1 to 1
13
12642
1
Winch cable clamp kit
14
11790
1
C-Hook, 1/4 cable
15
52479
1
Cable, 1/4" x 24-ft
16
11789
2
Clip, 1/4 cable
17
839 *
-
HHCS, 3/8 NC x 1 GR5
18
565 *
-
Washer, 3/8 flat
19
838 *
-
Washer, 3/8 lock
20
835 *
-
Hex nut, 3/8 NC plated
*
Standard hardware; obtain locally
54 Common Components
WINCH KIT (OPTIONAL)
DESCRIPTION
Winch Kit Operation
1. Move cutter so wing is on the up slope of a ditch
to aid in wing lift with the winch.
2. Unwind cable and remove roller (2).
3. Place cable around roller (2) and reinstall using
pin (3) and klik pin (4).
4. Attach cable hook into large hole in winch
assembly bracket (11) and raise wing.
5. Install transport lock pin before moving unit.
MAN1281 (4/15/2019)

Advertisement

Table of Contents
loading

Table of Contents