Woods BATWING BW20.50Q Operator's Manual page 37

Rotary cutter
Table of Contents

Advertisement

used as spacers and are placed between lock-up
bracket and channel (10) as needed.
4. Repeat step to install second channel (10) on
opposite wing.
5. Attach winch assembly to channels (10) using bolts
(5) and lock nuts (6).
6. Move SMV sign and hardware to channel as
shown in the winch kit instructions.
7. Tighten all hardware. See Parts page 77 for
complete diagram and part list.
Figure 26. Winch Channel Installation
Shredder Installation (Optional)
Crossbar Installation - Right Wing
(Figure 27 & Figure 30)
Figure 27. Right Crossbar and Blade Installation
MAN1281 (4/15/2019)
1. Install wing crossbar (1) on splined shaft. Use
flanged castle nut and cotter pin previously
removed. Torque nut to 450 lbs-ft.
2. Place CCW blade (3) over blade pin (7) and insert
blade pin through crossbar. Make sure blade offset
is to the bottom.
3. Place blade (4) over blade pin with flat surface on
the top.
4. Install bushing (8) over pin and blade and secure
with jam nut (9). Torque nut to 664 lbs-ft.
Crossbar Installation - Left Wing
1. Repeat
steps
for
installation.
2. Use wing crossbar (1) and offset CW blades (2)
and flat blades (4).
Crossbar Installation - Center Section
1. Repeat steps for center crossbar and blade
installation.
2. Use crossbar (1) and offset CCW blades (3) and
flat blades (4).
Install Stationary Blades - Center Section
1. Remove left skid shoe if needed.
2. Place stationary blade mounting bracket (6) on the
backside (outside) of the front left baffle. Mounting
bracket leg should point to the outside.
3. Secure mounting bracket into position using four
cap screws (12), eight hardened flat washes (14)
and flange lock nuts (13).
Figure 28. Blade Mounting Bracket Installation -
Center Section
Assembly 37
left
crossbar
and
blade

Advertisement

Table of Contents
loading

Table of Contents