Download Print this page

EBARA DDLFU Operating Instructions, Installation & Maintenance Manual page 5

Submersible dry pit non-clog water/wastewater pump

Advertisement

EBARA Submersible Sewage Pumps
Instruction Manual
Installation
3. Electrical Wiring:
Check that the power is locked off and disconnected before working on pump. All electrical work should be
performed by a qualified electrician and all national and local electrical codes must be observed.
(1) Wiring
a) Wire as indicated for the appropriate start system as shown in Fig. 2.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.
Output 15 to 30HP
208/230V
460V
EBARA Pumps Americas Corporation
www.pumpsebara.com
(803) 327-5005 • (803) 327-5097 (fax)
WARNING
G – GRN
L
– RED – T
– T
– T
1
1
7
6
L
– WHT – T
– T
– T
2
4
8
L
– BLK – T
– T
– T
3
3
9
5
P
– RED
1
P
– WHT
2
P
– BLK
3
P
– ORG
4
G – GRN
G – GRN
L
– RED – T
– T
1
1
12
L
– WHT – T
– T
2
2
10
L
– BLK – T
– T
3
3
11
T
– T
4
7
T
– T
5
8
T
– T
6
9
P
– RED
1
P
– WHT
2
P
– BLK
3
P
– ORG
4
G – GRN
DDLFU/DDLFMU
– T
12
– T
2
10
– T
11
5
rev. 04/19

Advertisement

loading

This manual is also suitable for:

Ddlfmu