Motorline professional COFRE 260 Installer And User Manual
Motorline professional COFRE 260 Installer And User Manual

Motorline professional COFRE 260 Installer And User Manual

Hide thumbs Also See for COFRE 260:

Advertisement

Quick Links

COFRE 260
INSTALLER AND USER´S MANUAL
v1.2
REV. 08/2015

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COFRE 260 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Motorline professional COFRE 260

  • Page 1 COFRE 260 INSTALLER AND USER´S MANUAL v1.2 REV. 08/2015...
  • Page 2: Table Of Contents

    CONTENT SAFETY INSTRUCTIONS INDEX STANDARDS TO FOLLOW . CONTENT ATTENTION: index | p. To ensure the people’s safety, it is important that you read all the following .SAFETY INSTRUCTIONS instructions. Incorrect installation or incorrect use of the product can cause physical standards to follow | p.
  • Page 3: Awning

    TECHNICAL CHARACTERISTICS EXPLODED VIEW Cassette awning COFRE 260 is an automated awning, produced with a case for fabric protection. Have it has articulated arms with double cable for increased strength and safety. It is equipped with an integrated electronic system to facilitate his mounting.
  • Page 4: Installation

    INSTALLATION INSTALLATION PRE-INSTALLATION INFO WALL WITHOUT CONDITIONS FOR INSTALLATION AWNING Chock WALL WITH CHOCKS NECESSARY FOR INSTALLATION AWNING For a correct operation of the awning, the measure A can not be changed. The wall bracket (nº 8) must be placed in zone B where the casing support (nº 4) is. Before starting the installation, check the wall leveling.
  • Page 5 INSTALLATION INSTALLATION CEILING 100mm 300mm 02 - Take the measurement at the location where the awning will be applied. Pay attention to the leveling of wall brackets (nº8) for fixing the awning. 03 - With the help of a pencil or marker, identify the drilling points for the placing of the wall brackets (nº8).
  • Page 6: Ceiling Installation | P

    INSTALLATION INSTALLATION CEILING INSTALLATION INCLINATION ARMS REGULATION Area of assistance during joint regulation. Area of assistance during the inclination arms regulation. RELIEVE 1 ARM EACH TIME OPTION 1 OPTION 2 Make the fixation on the consoles (nº21) using one of the two options identified in the images 14 and 15 (use M12 screws with washers).
  • Page 7: Articulation Adjustment | P

    INSTALLATION INSTALLATION ARTICULATION ADJUSTMENT MANUAL RELEASE The awning is prepared for, in case of power failure or other situation that prevents the electrical operation of the equipment, it is possible to make the opening or closing manually by using the handle (nº20). Crank Place the handle as shown in the picture 24 and turn it to open / close the awning.
  • Page 8: Fabric Regulation | P

    INSTALLATION CONTROL BOARD FABRIC REGULATION TECHNICAL SPECIFICATIONS If you detect any anomalies in the fabric winding (total closure of a side only), make the opening of the awning and place plastic shims in the place identified in the image 27 (the side that does not close).
  • Page 9: Group Or General Centralization | P

    CONTROL BOARD CONTROL BOARD FUNCTIONS CONTROL BOARD CONNECTIONS opening/closing, due to the possible presence of an obstacle or the complete Ground connection input. movement of opening/closing, the control board stops immediately the maneuver and Ground connection input. relieves. 230V power supply Input ~ (PHASE) 230V power supply Input ~ (NEUTRAL) Programming buttons and indicator LEDs Rising/Closing motor output...
  • Page 10 CONTROL BOARD CONTROL BOARD FUNCTIONS FUNCTIONS Programming wireless sensor sun/wind/rain for seconds. TEST SUN SENSOR Turn VR clockwise + and the awning will open for seconds. Turn the VR counterclockwise and the awning will close for seconds. In case the awning performs the indicated operations successfully, the sensor is programmed and the test finished.
  • Page 11: Programming | P

    A CENTRAL CONTROL BOARD CONTROL BOARD PROGRAMMING PROGRAMMING send the desired channel of remote control. LED CODE LAMP remains lit and Extended MENU programming is complete. Ref. LED LED OFF LED ON CODE PGM distance = ON PGM distance = OFF T.
  • Page 12: Troubleshooting

    CONTROL BOARD TROUBLESHOOTING PROGRAMMING INSTRUCTIONS FOR CONSUMERS AND SPECIALIZED TECHNICAL buttons at the same time and the LED display will be lit temporarily, confirming the success of the operation. If you have been reached the memory limit codes , repeating the programming operation, Problems Causes Solutions...
  • Page 13 CONNECTIONS TO CONTROL BOARD CONNECTIONS SCHEME (CONTROL BOARD MC6) CODE CODE L. FUSE FUSE 230V T.MOT. LAMP Ground wire Brown wire Blue wire Blue wire Brown wire Ground wire Ground wire Power Supply (3x1.5mm²) Circuit breaker 16A. not supplied LEDs Transformer Blue wire Brown wire...

Table of Contents