Compliance Test - Semtech Lora Mote User Manual

Loramoteconfig
Table of Contents

Advertisement

When the LED stops blinking the test is over.
Go to second site and set the "ID" field to 0
Note: Changing the "ID" field number with each site is capital. It enables the script later on to separate which data comes
from which site.
Repeat the procedure as much as necessary to cover all selected sites.
At the end of the test, log onto each gateway and recover all the packet-logger files. All those files can be placed in the
same directory on the PC. There might be several log files because the packet-logger closes the log file every 30
minutes and opens a new one each time to avoid losing all data in case of crash.
Zip the log directory and send it to support_rf@semtech.com for report generation.

3.5.4 Compliance Test

The compliance tests are part of the Sensors GPS Demo and GPS Traking Demo applications. These can be accessed using
the port 224 as specified by the LoRaAlliance.
LoRaMoteConfig
User Guide
Rev 1.2
UG001_SXC_V1.2
December 2016
www.semtech.com
14 of 15
Semtech

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lora mote ii

Table of Contents