Machine Setup
Unpack and Inspect
Begin by inspecting all components that shipped with the coating and curing unit. These may
include HEPA filter and blower assembly, tubing, a squirt dispensing bottle, gloves, adapter
suction cup, 5-gallon reservoirs, etc. If any parts or the machines are damaged in any way,
contact Ultra Optics immediately. Place the coating and UV cure units on a level table/bench
with the two 5-gallon reservoirs below the table/bench. It can be very helpful to install an
inspection light on the bench near the coating unit as well.
Electrical connections
Plug the Mini2 coating unit into a 110V, 5A circuit. Plug the Mini2 cure unit into a 110V, 15A
circuit. Each device is supplied with its own power cord.
HEPA Filter System
Place the HEPA filter system on top of the coating machine and secure it with screws. Plug the
HEPA system power cord into one of the provided outlets on the back of the coating unit.
Spindle Arm
Before connecting the air source to the coating unit, remove the bolt (see "A" in Figure 1). This
bolt is only used to secure the spindle arm during transportation. After the bolt is removed,
replace it with the guide pin (see "B" in Figure 1). The pin can be found in a plastic bag inside
the wash bowl.
Figure 1 - Spindle arm guide pin installation
www.ultraoptics.com
page 2