Air And Water Tubing Setup - Ultra Optics Mini2 Operation And Maintenance Manual

Table of Contents

Advertisement

Air and Water Tubing Setup

The following diagram should be used to route the tubing between the Mini2 coating unit and
the UV Cure unit, as well as the tubes that need to be run to the two water reservoirs.
Connect one end of the ½" tubing to the wash (Clean DI Water) connector on the lower right
side (viewed from the back) of the Mini2 coating unit. Pass the other end of the ½" tubing
through the hole in the lid of the reservoir and attach filter connector and filter inside of the
reservoir.
Connect the small ¼" diameter clear tubing to the smaller fitting in the reservoir cover and the
other end to the by-pass fitting located on the upper right side (viewed from the back) of the
Mini2 coating unit. Fill the reservoir with clean deionized water and secure the cover.
Connect the other piece of ½" tubing to the water drain fitting on the rear of the Mini2 coating
unit. Connect the other end of this ½" tube to the ½" fitting on the cover of the Waste Water
reservoir.
Adjust the air pressure regulators as follows:
Mini2 coating unit = 80 psi
Mini2 UV cure unit = 10-15 psi
Be sure to prime the coating and the wash systems prior to operating. These procedures
can be found in the Maintenance section of this manual.
www.ultraoptics.com
Figure 2 - Tubing setup diagram
page 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents