Prepare Boiler - Weil-McLain GOLD CGS 550-110-260/0508 User Manual

Gas-fired water boilers
Table of Contents

Advertisement

GOLD CGs Gas-Fired Water Boiler — Boiler Manual
1c
Prepare boiler location — vent system
Failure to follow all instructions can result in fl ue gas spillage and carbon monoxide emissions, causing severe
personal injury or death.
Inspect existing chimney before installing boiler. Failure to clean or replace perforated pipe or tile lining will cause
severe personal injury or death.
DO NOT COMMON VENT
cause fl ue gas spillage or appliance malfunction, resulting in possible severe personal injury, death or substantial
property damage.
When removing boiler from an
existing common vent system:
At the time of removal of an existing boiler, the fol-
lowing steps shall be followed with each appliance
remaining connected to the common venting system
placed in operation, while the other appliances remain-
ing connected to the common venting system are not
in operation.
a.
Seal any unused openings
system.
b.
Visually inspect the venting system
size and horizontal pitch and determine there is no
blockage or restriction, leakage, corrosion or other
defi ciencies which could cause an unsafe condi-
tion.
c.
Test vent system
building doors and windows and all doors between
the space in which the appliances remaining con-
nected to the common venting system are located
and other spaces of the building. Turn on clothes
dryers and any appliance not connected to the com-
mon venting system. Turn on any exhaust fans, such
as range hoods and bathroom exhausts, so they will
operate at maximum speed. Do not operate a sum-
mer exhaust fan. Close fi replace dampers.
d.
Place in operation
Follow the lighting/operating instructions. Adjust
thermostat so appliance will operate continuously.
e.
Test for spillage
5 minutes of main burner operation. Use the fl ame
of a match or candle.
f. After it has been determined that
remaining connected to the common venting system
properly vents when tested as outlined above, return
doors, windows, exhaust fans, fi replace dampers,
and any other gas-burning appliance to their previ-
ous conditions of use.
Any improper operation of common venting system
should be corrected so the installation conforms with
the National Fuel Gas Code, ANSI Z223.1-latest edition.
Correct by resizing to approach the minimum size as
determined using the appropriate tables in Part 11 of
that code. Canadian installations must comply with
B149.1 or B149.2 Installation Code.
8
— Do not install the CGs into a common vent with any other appliance. This will
in the common venting
for proper
— Insofar as is practical, close all
the appliance being inspected.
at draft hood relief opening after
each appliance
CGs special vent system
Vent system
The CGs boiler requires a special vent system, designed
for pressurized venting. Model CGs-3 is rated ANSI
Z21.13
(pressurized vent, likely to condense
Category IV
in the vent). Models CGs-4, -5 and -6 are rated Z21.13
(pressurized vent).
Category III
You may use any of the vent systems covered by the
CGs Venting Supplements included in the envelope as-
sembly. The CGs vent starter is a special item, designed
only for the CGs boiler, available from each vendor. Do
not attempt to connect the vent to the CGs boiler with
any other means.
DO NOT
different systems. The vent system
could fail, causing leakage of fl ue
products into the living space.
Vent termination and combustion air
supply
The CGs boiler may be vented through the roof or
through a side wall. Follow the appropriate vent supple-
ment for the vent system chosen. The maximum vent
length depends on boiler size. Refer to the vent supple-
ment to determine acceptable vent length.
Combustion air for the CGs boiler may be from in-
side or ducted directly to the boiler from outside. For
outside air (direct vent installation), two options are
available for the fl ue/air termination. The air supply
must
terminate at the same location as the
ALWAYS
fl ue, using either:
1.
installation. Obtain the
Vertical direct vent
Weil-McLain
Through-Roof or Through-Unused
termination kit and supplement. Refer
Chimney
to
Vertical Direct Venting
packed with the kit, and to the vent manufacturer's
instructions for the vent material chosen.
2.
installation. Use the
Sidewall direct vent
termination kit shipped with the boiler. Refer
Intake
to
CGs Direct Venting: Sidewall & Direct Exhaust
Venting: Vertical or Sidewall
shipped with the boiler.
Part number 550-110-260/0508
mix components from
Venting Supplement,
Vent/Air
Venting Supplement

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gold cgs

Table of Contents