I. General Requirements
A. Furnish and install (
Efficiency gas fired cast iron sectional boiler(s) that that can use outside air for combustion.
B. Install boiler-burner unit(s) in compliance with manufacturers installation instructions. All work
must be done in a neat and workman like manner.
C. Weil-McLain qty.( ) CGs boiler(s) size(s) ( ) capable of burning natural gas at 5 to 13"w.c. or
propane 11 to 13"w.c. inlet pressure.
1. Packaged boiler (standard).
2. High grade stainless steel burners for natural or propane gas firing.
3. Water.
4. Minimum 84% efficiency.
5. Induced draft.
6. Intermittent pilot with electronic module control with diagnostic lights.
D. Boiler(s) shall have I=B=R Hydronics Institute gross output(s) at 100% firing rate –
(
) MBH per boiler.
E. Boiler(s) shall be manufactured by ISO 9001 registered company to conform to Section IV of
the ASME Boiler and Pressure Vessel Code.
1. Individual sections (and section assembly) to be hydrostatically pressure tested at factory
in accordance with ASME requirements.
2. Maximum allowable working pressure 50 PSIG water and cast as part of section with
ASME symbol.
F. Regulatory Requirements
1. Boiler(s) and controls to comply with applicable regulations.
G. Submittals
1. Submit shop drawings and product data.
2.
Submittal packet to include boiler (and burner) manufacturer descriptive literature,
installation instructions, operating instructions, and maintenance instructions.
II.

Product

A.
Acceptable boiler/burner manufacturer(s) include(s):
1. Weil-McLain only, as specified in Part 1, Paragraph C.
2. Other manufacturer(s) or other Weil-McLain boiler(s) must comply with specifying
engineer's requirements, including:
1
CGs SERIES BOILER
SUGGESTED SPECIFICATIONS
) low pressure packaged, sealed combustion, power vented, high
06/10/08

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CGs SERIES and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Weil-McLain CGs SERIES

  • Page 1 B. Install boiler-burner unit(s) in compliance with manufacturers installation instructions. All work must be done in a neat and workman like manner. C. Weil-McLain qty.( ) CGs boiler(s) size(s) ( ) capable of burning natural gas at 5 to 13”w.c. or propane 11 to 13”w.c. inlet pressure.
  • Page 2 a) Full intent of these specifications, and provide complete submittal including literature, wiring diagrams, fuel piping diagrams, and a list of similar installations. b) Submittal to be presented to specifying engineer at least seven working days for approval before bid opening. Substitutions are not permitted after contract is awarded.
  • Page 3 06/10/08 Boiler Manuals: 1. Boiler, gas control and user’s information manual. 2. Venting supplements and instructions. Weil-McLain 500 Blaine Street Michigan City, IN 46360-2388 http://www.weil-mclain.com C-880 (0700)

Table of Contents