1c
Prepare boiler location — clearances
Recommended SERVICE clearances
(Fig. 1)
1. Provide clearances for cleaning and servicing the boiler and for
access to controls and components. See Figure 1 for recommen-
dations.
2. Provide at least screwdriver clearance to jacket front panel screws
for removal of front panel for inspection and minor service. If
unable to provide at least screwdriver clearance, install unions
and shutoff valves in system so boiler can be moved for servicing.
Figure 1
Recommended
SERVICE
clearances
(see WARNING
below)
If any clearance is less than in Figure 1, pro-
vide openings for combustion and ventilation
air located on the wall or door opposite the
boiler FRONT (see Figure 2)
These openings must be located as shown in Figure 2 to provide
proper air flow around the boiler. The free area of each opening
(after deducting for louvers) must be at least
1,000 Btuh
of boiler input. If the building is of unusually tight
construction (see page 11 for definition), the air openings must
connect directly to outside or the building must have air openings
to the outside as specified on page 11.
If clearances are equal to or greater than Figure 1, see pages 10 and
11 for location and sizing of combustion air openings.
Failure to comply can result in severe personal injury, death or
substantial property damage and reduced boiler life.
Required MINIMUM clearances
Never install the boiler in a space with clear-
ances less than the minimum clearances
shown in Figure 2
in severe personal injury, death or substantial
property damage and reduced boiler life.
Hot water pipes: at least ¹⁄₂ inch
1.
Single-wall vent pipe: at least 6 inches
2.
material.
3.
Type B double-wall metal vent pipe
turer's recommendation for clearances to combustible material.
Part Number 550-110-290/0219
.
one square inch per
(Fig. 2)
. Failure to comply can result
from combustible material.
from combustible
: refer to vent manufac-
Boiler Manual
Figure 2
Required MINIMUM clearances
Flooring
The CGt boiler is approved for installation on combustible
flooring, but must never be installed on carpeting.
Do not install boiler on carpeting even
if foundation is used. Fire can result,
causing severe personal injury, death
or substantial property damage.
Foundation
1. Provide a solid brick or minimum 2-inch thick concrete
foundation pad if any of the following is true:
floor can become flooded.
the boiler mounting area is not level.
2. Minimum dimensions are
Residential garage installations
Take the following special precautions when installing the
boiler in a residential garage. If the boiler is located in a
residential garage, per ANSI Z223.1 – latest edition:
Mount the boiler a minimum of
floor
of the garage to assure the burner and ignition
devices will be no less than 18 inches above the floor.
protect the boiler
Locate or
by a moving vehicle.
25" long
18" wide
by
.
18 inches above the
so it cannot be damaged