Weider WESY78734 User Manual page 10

Resistance system
Table of Contents

Advertisement

11. Insert the Resistance Bar (9) between the
Crossbar Guides (15), and center it on the
Crossbar Block (not shown).
Press a Pulley Bracket (10) onto the Resistance
Bar (9). Screw a 3/8" x 38mm Tension Screw
(117) into the Pulley Bracket a couple of turns.
Make sure the hexagonal hole in the Screw is
on the outside of the Bracket.
Attach a Tether (70) to the Pulley Bracket (10) at
the upper hole with an M10 x 64mm Button Bolt
(80), an M10 Thick Washer (54), and an M10 Nylon
Locknut (103).
Repeat this step on the other side of the
Resistance Bar (9). Then, tighten the lower
M10 x 152mm Bolt (86) used in step 10.
12. Hold a Large Pulley (14) inside of the Upper
Cable (121). Attach the Pulley to a Pulley Bracket
(10) with an M12 x 58mm Button Bolt (87) and an
M12 Nylon Locknut (13). Make sure that the
cable is routed as shown in the CABLE DIA-
GRAM on page 19.
13. Hold a Large Pulley (14) inside the Upper Cable
(121). Attach the Pulley to the other Pulley
Bracket (10) with an M12 x 58mm Button Bolt
(87) and an M12 Nylon Locknut (13). Make sure
that the cable is routed as shown in the
CABLE DIAGRAM on page 19.
Tighten the two 3/8" x 38mm Tension Screws
(117) an equal number of turns.
14. Attach the Leg Lever (56) to the Leg (5) with a
Leg Station Pin (60). Slide a Cotter Pin (113) onto
the Leg Station Pin.
11
12
10
87
14
121
13
121
14
56
10
15
70
54
9
10
80
117
13
13
117
10
14
87
5
60
103
113

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Platinum

Table of Contents