Weider WESY37530 User Manual page 14

Weight system
Table of Contents

Advertisement

26. Route the High Cable (61) up through the Right
Top Frame (10) and over a 90mm Pulley (38).
Attach the Pulley inside the Top Frame with an
M10 x 78mm Bolt (86), two M10 Washers (74),
two 17mm Spacers (58), and an M10 Nylon
Locknut (75).
27. Route the High Cable (61) over a 90mm Pulley
(38) and down through the Right Top Frame (10).
Attach the Pulley inside the Top Frame with an
M10 x 78mm Bolt (86), two M10 Washers (74),
two 17mm Spacers (58), and an M10 Nylon
Locknut (75).
28. Locate the Short Cable (62). Attach the eyelet
on the Cable to the bracket on the bottom of the
Right Top Frame (10) with an M8 x 20mm
Shoulder Bolt (36), and an M8 Nylon Locknut
(54). Do not tighten the Locknut yet.
29. Wrap the Short Cable (62) under a 90mm Pulley
(38). Attach the Pulley and a Cable Trap (37) to
the first set of holes from the top of the other
Double "U"-bracket (41) with an M10 x 48mm Bolt
(23) and an M10 Nylon Locknut (75). Make sure
the Cable Trap is turned to hold the Cable in
the groove of the Pulley.
30. Route the Short Cable (62) over a 90mm Pulley
(38). Attach the Pulley to the rear bracket on the
Right Top Frame (10) with an M10 x 45mm Bolt
(78) and an M10 Nylon Locknut (75).
26
86
58
10
27
74
75
58
61
28
10
Bracket
29
62
38
23
41
30
78
62
14
61
38
74
74
58
75
38
10
74
58
86
54
36
62
37
75
10
Rear
Bracket
75
38

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro 3770

Table of Contents