Defrost Operation In Heating Operation Stopped - Fujitsu ASUG09LZAS Service Manual

Wall mounted type, refrigerant r410a inverter, indoor/outdoor
Hide thumbs Also See for ASUG09LZAS:
Table of Contents

Advertisement

6-1. Defrost operation in heating operation stopped

If the outdoor unit is frosted when stopping the heating operation, it stops after performing the auto-
matic defrosting operation.
In this time, if the indoor unit operation lamp flashes slowly (6 sec on/2 sec off), the outdoor unit al-
low the heat exchanger to defrost, and then stop.
Triggering condition
When all of the following conditions are satisfied in heating operation
– Compressor operation integrating time: 30 minutes or more
– Compressor continuous operation time: 10 minutes or more
– Outdoor unit heat exchanger temperature: -4°C or less
Release condition
The defrost operation is released when either one of the conditions below is satisfied.
Outdoor unit heat exchanger temperature
(after 1 minute or later since compressor start)
Compressor operation time
6-1. Defrost operation in heating operation stopped
- (04-24) -
13°C or more
15 minutes
6. Defrost operation control

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asug12lzasAsug15lzasAoug09lzas1Aoug12lzas1Aoug15lzas1

Table of Contents