Page 1
USE AND MAINTENANCE INSTRUCTIONS SPARE PARTS CATALOGUE TZ S CHASSIS NUMBER: YEAR OF CONSTRUCTION: GARBIN GROUP SRL - unipersonale Via L. da Vinci, 32/B- 36034 Malo (VI) – ITALY Tel. +39 445 602900 - Fax +39 445 580101 info@garbin.it WWW.garbin.it Use and maintenance instructions –...
TRENCHER TZ S PRESENTATION Before using the machine, please complete and return the document, as indicated below. DOCUMENTS TO POST OR FAX TO THE MANUFACTURER DOCUMENT PAGE METHOD DECLARATION OF DELIVERY OF Fill in all sections and sign. DOCUMENTATION Send a copy within 8 days from the date of delivery of the machine.
Manufacturer Authorised Dealer Date: ……/……/…… MACHINE CUSTOMER Name: Name: TZ S TRENCHER Serial number: Address: Year of construction: This is to certify that the machine in question was tested by an authorised tester: Mr.………….………………………………….……………………………; The machine ignition keys were given to the Customer or authorised operator under their own responsibility: Mr.………….………………………………….……………………………;...
TRENCHER TZ S DECLARATION OF DELIVERY OF DOCUMENTATION TO CUSTOMER MACHINE Name: MANUAL TRENCHER Model: TZ S Serial number: ___________________________________________ Year of construction: ___________________________________________ CUSTOMER Name: ________________________________________________________ Address: ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ DOCUMENTS DELIVERED Name: USE AND MAINTENANCE INSTRUCTIONS – SPARE PARTS CATALOGUE...
If the goods are not paid for on delivery, payment must be made within sixty days from the invoice date. l) Payment is always made at the head office of GARBIN GROUP SRL in Malo (VI) Italy, even if by means of promissory notes or drafts.
TRENCHER TZ S CONTENTS page 2 PRESENTATION Declaration of dispatch of documentation to authorised operators page 2 Test certificate page 3 Declaration of dispatch of documentation to the customer page 4 Warranty page 5 page 6 CONTENTS page 8 1- CE DECLARATION AND MARKING page 8 1.1- CE Declaration of Conformity...
Page 7
TRENCHER TZ S page 30 7- USE AND OPERATION page 30 7.1- Positions occupied by authorised operators 7.2- Command and control levers page 32 page 33 7.3- Checks prior to starting 7.4- Correct operating posture page 34 page 34 7.5- Switching on the machine 7.6- Handling the machine...
TZ S 1.1 CE DECLARATION AND MARKING DECLARATION OF CONFORMITY (Annex II Part A) We Garbin Group Ltd, as a manufacturer, declare under our sole responsibility that the machine indicated below: Name: TRENCHER (Annex I, point 54) Type: EXCAVATOR Model: TZ S...
TRENCHER TZ S 1.2- CE MARKING CE marking certifies compliance of the machine with the essential health and safety requirements established by the European Directives indicated in the CE declaration of conformity. It consists of an aluminum plate, printed in black, with the following dimensions: L= 120 mm - H= 60 mm - thickness 0.80 mm (FIG.
TRENCHER TZ S 2- GENERAL 2.1- IMPORTANCE OF THE MANUAL AUTHORISED OPERATORS MUST READ AND UNDERSTAND ALL PARTS OF THIS MANUAL BEFORE USING THE MACHINE. This technical “Use and maintenance instructions” manual was drawn up according to the contents of the European directives in order to ensure the issues in question can be easily and correctly understood by the operators authorised to use and service the machine in question.
TRENCHER TZ S N.B. (Nota Bene): uppercase text in a box. Bold type: highlights important sentences. Italic type: used for the captions of figures and tables. 2.2.1- RECIPIENTS (AUTHORISED OPERATORS) This technical manual has been exclusively written for operators authorised to use and service the machine according to the specific technical and professional skills required for these operations.
TRENCHER TZ S ELECTRICAL MAINTENANCE MAN This person is a qualified technician (possessing the professional and technical skills required by current legislation), authorised to exclusively work on electrical devices in order to make adjustments, maintenance and/or repairs, also in the presence of electricity and with the safety guards disabled (after...
TRENCHER TZ S 2.4- RESERVED RIGHTS The Manufacturer reserves all rights to this "Installation, use and maintenance instructions" manual. All the information contained herein (text, drawings, diagrams, etc.) is confidential. No part of this manual may be reproduced and disclosed (totally or partially) in any way (photocopies, microfilms and the like) without the written authorisation of the Manufacturer.
TRENCHER TZ S 3.3- IDENTIFICATION OF COMPONENTS FIGS. 2, 3, and 4 show and identify the main machine components. RH SIDE 1) Safety device for stopping engine (red, normally-open operation) 2) Adjustable lever for securing the handlebar 3) Front wheel...
Page 15
TRENCHER TZ S LH SIDE 15) Accelerator 16) Tow ratchet engage-disengage leverr 17) Safety guard 18) Chain guard 19) Trench jib 20) Digging tools 21) Lead pinion 22) Trench chain 23) LH wheel FIG. 3 (Identification of components) Use and maintenance instructions – Spare parts Via L.da Vinci,32/B...
Page 16
TRENCHER TZ S REAR FRONT LH SIDE TOP VIEW OPERATOR SIDE TRENCHING SIDE RH SIDE MATERIAL DISCHARGE SIDE DIRECTION OF MOVEMENT WHEN WORKING FIG. 4 (Identification of components) Use and maintenance instructions – Spare parts Via L.da Vinci,32/B Rev. 01.2013 - EN (translation of the original instructions)
TRENCHER TZ S 3.4 - DIMENSIONS FIG. 5 shows the overall dimensions of the machine and of the possible trenching depths RH SIDE REAR LH SIDE (Dimensions: mm) FIG. 5 (Dimensions of machine with tool) Use and maintenance instructions – Spare parts Via L.da Vinci,32/B...
TRENCHER TZ S 3.5- TECHNICAL DATA TAB. 2 shows the main technical data of the machine. MACHINE ENGINE Brand HONDA GX 200 Type Single-cylinder OHV engine with horizontal shaft, Otto cycle, 4 stroke, cylinder inclined 25°, Engine type forced-air cooling...
Page 19
TRENCHER TZ S TYRES Studded drive tyres with inner tube “TRACTOR” 16x6.50-8 4PR Support tyres with inner tube 15.600x6”PR RIG CHAIN TRENCH ASSEMBLY Trench chain with tool holder bars Length of chain: standard 32 pins Main shaft pin and lead pinion...
TRENCHER TZ S 3.6- INCORPORATED MACHINES The machines incorporated in the trencher are supplied with declaration of conformity, CE marking and use and maintenance instructions (supplied to the Customer). TAB. 3 shows the names and addresses of the relative manufacturers.
TRENCHER TZ S 3.8- POWER SOURCES POWER SOURCE SUPPLY HYDRAULIC • Hydraulic oil FUEL • Unleaded petrol TAB. 5 (Power sources) 3.9- PROCESSING PHASES 1) Checks prior to starting (see para 7.3); 2) Correct posture (see para 7.4); 3) Starting the machine (see para 7.5);...
TRENCHER TZ S LIMITS TO USE: IT IS STRICTLY FORBIDDEN TO USE THE MACHINE FOR PURPOSES OTHER THAN THE ONE INDICATED BY THE MANUFACTURER (SEE PARA 3.7). THE MANUFACTURER DECLINES ALL LIABILITY FOR HARM TO PERSONS AND ANIMALS OR DAMAGE TO PROPERTY CAUSED BY THE NON-OBSERVANCE OF THE INSTRUCTIONS CONTAINED IN THIS MANUAL.
TRENCHER TZ S THE MACHINE IS PACKED, LIFTED AND LOADED ONTO THE CARRIER'S VEHICLE BY THE MANUFACTURER USING QUALIFIED STAFF AND SUITABLE EQUIPMENT IN OBSERVANCE OF CURRENT SAFETY REGULATIONS. THE MACHINE MUST BE LIFTED AND UNLOADED FROM THE CARRIER'S VEHICLE BY THE CUSTOMER USING QUALIFIED STAFF AND SUITABLE EQUIPMENT IN OBSERVANCE OF CURRENT SAFETY REGULATIONS.
TRENCHER TZ S CRANES, ROPES, CABLES AND/OR SLINGS, HOOKS AND/OR SNAP-HOOKS, COMPLIANT WITH CURRENT LEGISLATION AND SUITABLE FOR THE USE AND LOAD MUST BE USED (SEE TAB. 2 - PARA 3.5). ONLY USE THE CONNECTION POINTS INDICATED BY THE MANUFACTURER.
TRENCHER TZ S 6.2- SAFETY SYSTEMS The following safety systems are used in the machine: 1) GUARDS These protect the drive transmissions organs (belts and pulleys) of the digging tool transmission assembly. 2) SAFETY BAR Steel bar located over the digging equipment. Partially covers the equipment and protects from accidental contact.
Page 26
TRENCHER TZ S FIG. 6 (Safety and indicator signs) HAZARDS SIGNAL MEANING DANGER OF GETTING CAUGHT UP IN MOVING EQUIPMENT (When the machine is operating, there is the danger of accidental contact with the moving equipment). DANGER FLYING OBJECTS (When the machine is operating, there is the danger of the moving equipment accidentally projecting objects - earth, stones, etc.
TRENCHER TZ S 6.4- PERSONAL PROTECTIVE EQUIPMENT (PPE) The use of Personal Protective Equipment (PPE) is required by the occupational health and safety in force in the country of use of the machine. The employer and authorised operators must be familiar with and comply with the obligations and duties established in this legislation.
TRENCHER TZ S 6.5- PRODUCT SAFETY SHEETS The physical and chemical properties of the products used for processing (para 3.10) are indicated in the relative “SAFETY SHEETS” provided by the respective manufacturers/suppliers. THE CUSTOMER MUST REQUEST ITS MANUFACTURERS/SUPPLIES FOR THE SPECIFIC...
Page 29
TRENCHER TZ S RESIDUAL DANGER OF BEING CAUGHT UP, DRAGGED AND CRUSHED IN CONTACT WITH THE MOVING EQUIPMENT. RISK N° 3 FREQUENCY OF Low and accidental. Exposure may occur if the operator decides to perform and incorrect, forbidden and not reasonably foreseeable manoeuvre.
TRENCHER TZ S 7- USE AND OPERATION 7.1- POSITIONS OCCUPIED BY AUTHORISED OPERATORS The operators, authorised according to the type of manual work required, must only occupy the positions occupied in FIG. 7 and described in TAB. 14. DEPENDING ON THE POSITIONS THEY OCCUPY, THE AUTHORISED OPERATORS MUST ONLY PERFORM THE MANUAL OPERATIONS DESCRIBED IN THE RELATIVE PARAGRAPHS.
Page 31
TRENCHER TZ S AUTHORISED POSITION DESCRIPTION OPERATORS Before transporting and handling the machine (see chap. 4). To perform the required maintenance operations, following permission by the safety manager. A - MOVING THE MACHINE: Standing up in the machine driving position to: 1) Switch the machine on and off;...
TRENCHER TZ S 7.2- COMMAND AND CONTROL LEVERS From the driving position A (see para 7.1) the authorised operator performs the operations he/she is specifically responsible for RH SIDE REAR LH SIDE FRONT FIG.8 (Command and control levers) Use and maintenance instructions – Spare parts Via L.da Vinci,32/B...
TRENCHER TZ S KEY FIG. 8 REF. NAME FUNCTIONS When the lever is pressed the engine runs; as soon as it is Safety device for stopping the engine released the engine stops (micro-switch with normally- (red) “ENGINE STOP” open operation).
TRENCHER TZ S 7.4- CORRECT OPERATING POSTURE The authorised operator must use the correct operating posture indicated in FIG. 9 for an optimal work position, must use all the controls correctly and must also drive safely. RH SIDE BACK FORWARDS FIG.9 (Correct operating posture)
TRENCHER TZ S AUTHORISED OPERATORS MAY ONLY TURN THE MACHINE ON AFTER PERFORMING ALL THE CHECKS INDICATED IN PARA 7.3. MACHINE STATUS: Off, as described in para 2.2.2. 1) Move the engine switch to “ON” (see Fig.2 pos.10) 2) Position the accelerator for starting (see Fig.3 pos.13). Make sure the accelerator is not fully but only slightly open in order to allow the engine to start.
TRENCHER TZ S THE TYPE OF TRENCH DEPENDS ON THE TYPE OF GROUND AND THE EQUIPMENT MOUNTED ON THE MACHINE. IT MUST BE PERFORMED IN TOTAL OBSERVANCE OF THE DESIGN TECHNICAL SPECIFICATIONS PROVIDED BY A QUALIFIED PROFESSIONAL. MACHINE STATUS: Engine off with the equipment raised a few centimetres from the ground, located in the digging site and aligned with the outline of the trench to dig;...
TRENCHER TZ S 7.9- CLEANING THE MACHINE After digging, clean the machine as follows: 1) Move the machine as indicated in para 7.6 to a safe and dry area; 2) Clean the machine, tools and parts in contact with the excavated material using suitable equipment (spatulas, soft brushes, dry cloths, etc.).
TRENCHER TZ S 7.14- WIRING DIAGRAM COIL SPARK PLUG STOP Use and maintenance instructions – Spare parts Via L.da Vinci,32/B Rev. 01.2013 - EN (translation of the original instructions) 36034 Malo (VI) Italy T E Z A...
TRENCHER TZ S 8- MAINTENANCE 8.1- ROUTINE MAINTENANCE Routine maintenance is performed in order to maintain the conditions of use and operation of the machine and comprises various activities (adjustments, visual inspections, cleaning, etc.) which are performed by authorised operators at the frequencies established in TAB. 17 A/B.
Page 40
TRENCHER TZ S ROUTINE MAINTENANCE TABLE FREQUENCY WORK POINT TYPE OF OPERATION Nuts and bolts (on the whole Check and, if necessary, tighten the nuts and machine) bolts. (Maintenance Sheet N° 05) Check the correct tightness of the trench chain.
TRENCHER TZ S 8.1.2- MAINTENANCE SHEETS AND REGISTRATION SHEETS AUTHORISED OPERATORS MUST RECORD THE MAINTENANCE WORK PERFORMED ON THE MACHINE IN THE RELATIVE REGISTRATION SHEETS (SEE FOLLOWING PAGES). MAINTENANCE SHEET WORK POINT ENGINE N° 01 TYPE OF OPERATION CHECKING THE OIL LEVEL EVERY DAY: OPERATION TO PERFORM WHEN OIL IS COLD 1) Remove the oil filling cap/level stick of the oil and clean the stick.
Page 42
TRENCHER TZ S WORK POINT ENGINE MAINTENANCE SHEET N° 01 TYPE OF OPERATION CHECKING THE OIL LEVEL DATE OPERATOR SIGNATURE REMARKS Level control ……../….…./….…. ………………….. ………………….. Topped up with …………..litres Level control ……../….…./….…. ………………….. ………………….. Topped up with …………..litres Level control ……../….…./….….
Page 43
TRENCHER TZ S MAINTENANCE SHEET WORK POINT MAIN SHAFT BEARINGS N° 02 TYPE OF OPERATION GREASING EVERY DAY 1) Grease the main shaft bearings using the grease nipple. Pos. 1 2) Record the operation on registration sheet N°02. Pos. 1...
Page 44
TRENCHER TZ S WORK POINT MAIN SHAFT BEARINGS MAINTENANCE SHEET N° 02 TYPE OF OPERATION GREASING DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. …………………..
Page 45
TRENCHER TZ S MAINTENANCE SHEET WORK POINT ENGINE AIR FILTER N° 03 TYPE OF OPERATION CLEAN BOX AND FILTER EVERY DAY CONSULT THE ATTACHED HONDA ENGINE MANUAL Use and maintenance instructions – Spare parts Via L.da Vinci,32/B Rev. 01.2013 - EN (translation of the original instructions)
Page 46
TRENCHER TZ S WORK POINT ENGINE AIR FILTER MAINTENANCE SHEET N° 03 TYPE OF OPERATION CLEAN BOX AND FILTER DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. …………………..
Page 47
TRENCHER TZ S MAINTENANCE SHEET WORK POINT TOOLS AND SEATS N° 04 VISUAL INSPECTION FOR WEAR AND TYPE OF OPERATION LUBRICATION EVERY DAY 1) Check the tools (Ref.1) and seats (Ref.2) for wear; 2) If necessary, replace the tools with original spares;...
Page 48
TRENCHER TZ S WORK POINT TOOLS AND SEATS MAINTENANCE SHEET N° 04 VISUAL INSPECTION FOR WEAR AND TYPE OF OPERATION LUBRICATION DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….….
Page 49
TRENCHER TZ S NUTS AND BOLTS (ON THE WHOLE MAINTENANCE SHEET WORK POINT MACHINE) N° 05 CHECK AND, IF NECESSARY, TIGHTEN THE TYPE OF OPERATION NUTS AND BOLTS. EVERY DAY 1) Record the operation on registration sheet N°05. RH SIDE LH SIDE Use and maintenance instructions –...
Page 50
TRENCHER TZ S NUTS AND BOLTS (ON THE WHOLE WORK POINT MAINTENANCE SHEET MACHINE) N° 05 CHECK AND, IF NECESSARY, TIGHTEN THE TYPE OF OPERATION NUTS AND BOLTS. DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. …………………..
Page 51
TRENCHER TZ S MAINTENANCE SHEET WORK POINT CHAIN TIGHTNESS CONTROL N° 06 CHECK AND, IF NECESSARY, TIGHTEN THE TYPE OF OPERATION CHAIN - LUBRICATION. EVERY DAY 1) Position the trench jib so that the chain is parallel to the ground (see Fig.);...
Page 52
TRENCHER TZ S WORK POINT CHAIN TIGHTNESS CONTROL MAINTENANCE SHEET N° 06 CHECK AND, IF NECESSARY, TIGHTEN THE TYPE OF OPERATION CHAIN - LUBRICATION. DATE OPERATOR SIGNATURE REMARKS Voltage control ……../….…./….…. ………………….. ………………….. Lubrication Voltage control ……../….…./….…. ………………….. ………………….. Lubrication Voltage control ……../….…./….….
Page 53
TRENCHER TZ S MAINTENANCE SHEET WORK POINT OPEN GREASE NIPPLES + LUBRICATE N° 07 TYPE OF OPERATION GREASE + LUBRICATE EVERY DAY 1) Grease all the indicated points (see Fig.). 2) Record the operation on registration sheet N°07. RH SIDE LH SIDE Use and maintenance instructions –...
Page 54
TRENCHER TZ S WORK POINT OPEN GREASE NIPPLES + LUBRICATE MAINTENANCE SHEET N° 07 TYPE OF OPERATION GREASE + LUBRICATE DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ……………………………………………………………….
Page 55
TRENCHER TZ S MAINTENANCE SHEET WORK POINT TRENCH JIB GEAR MOTOR N° 08 TYPE OF OPERATION CHECKING THE OIL LEVEL AFTER THE FIRST 50 HOURS OF WORK. OPERATION TO PERFORM WHEN THE OIL IS COLD 1) Check the oil level and top up if necessary pos.1.
Page 56
TRENCHER TZ S WORK POINT TRENCH JIB GEAR MOTOR MAINTENANCE SHEET N° 08 TYPE OF OPERATION CHECKING THE OIL LEVEL DATE OPERATOR SIGNATURE REMARKS Level control ……../….…./….…. ………………….. ………………….. Topped up with ……………litres Level control ……../….…./….…. ………………….. ………………….. Topped up with ……………litres Level control ……../….…./….….
Page 57
TRENCHER TZ S CHECK THE CHAIN, TOOLHOLDER AND MAINTENANCE SHEET WORK POINT SCREW FOR WEAR N° 09 VISUAL INSPECTION FOR WEAR AND TYPE OF OPERATION LUBRICATION AFTER THE FIRST 50 HOURS OF WORK 1) Check the tools (Ref.1) and seats (Ref.2) for wear;...
Page 58
TRENCHER TZ S CHECK THE CHAIN, TOOLHOLDER AND WORK POINT MAINTENANCE SHEET SCREW FOR WEAR N° 09 VISUAL INSPECTION FOR WEAR AND TYPE OF OPERATION LUBRICATION DATE OPERATOR SIGNATURE REMARKS Check for wear ……../….…./….…. ………………….. ………………….. Lubrication Check for wear ……../….…./….….
Page 59
TRENCHER TZ S MAINTENANCE SHEET WORK POINT CHECK THE TRANSMISSION BELT – CHAIN N° 10 VISUAL INSPECTION FOR WEAR AND TYPE OF OPERATION TIGHTNESS AFTER THE FIRST 50 HOURS OF WORK 1) Remove the LH safety guard pos.1 (see Fig.3 pos. 15);...
Page 60
TRENCHER TZ S WORK POINT CHECK THE TRANSMISSION BELT – CHAIN MAINTENANCE SHEET N° 10 VISUAL INSPECTION FOR WEAR AND TYPE OF OPERATION TIGHTNESS DATE OPERATOR SIGNATURE REMARKS Check for wear ……../….…./….…. ………………….. ………………….. Voltage control Check for wear ……../….…./….….
Page 61
TRENCHER TZ S MAINTENANCE SHEET WORK POINT MOTOR N° 11 TYPE OF OPERATION CHANGING THE OIL AFTER THE FIRST 50 HOURS OF WORK AND THEN AFTER EVERY 100 HOURS 1) Heat the engine for a few moments to allow the engine oil to drain more easily;...
Page 62
TRENCHER TZ S WORK POINT MOTOR MAINTENANCE SHEET N° 11 TYPE OF OPERATION CHANGING THE OIL DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. …………………..
Page 63
TRENCHER TZ S MAINTENANCE SHEET WORK POINT TRENCH JIB GEAR REDUCER N° 12 TYPE OF OPERATION CHANGING THE OIL AFTER THE FIRST 100 HOURS OF WORK AND THEN AFTER EVERY 100 HOURS 1) Place a suitable oil collector bin under the drain cap;...
Page 64
TRENCHER TZ S WORK POINT TRENCH JIB GEAR REDUCER MAINTENANCE SHEET N° 12 TYPE OF OPERATION CHANGING THE OIL DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. …………………..
Page 65
TRENCHER TZ S MAINTENANCE SHEET WORK POINT WHEELS N° 13 TYPE OF OPERATION CHECK TYRE PRESSURE AND WEAR AFTER THE FIRST 100 HOURS OF WORK AND THEN AFTER EVERY 100 HOURS 1) Check the pressure of the tyres and their state of wear (Ref. 1-2-3);...
Page 66
TRENCHER TZ S WORK POINT WHEELS MAINTENANCE SHEET N° 13 TYPE OF OPERATION CHECK TYRE PRESSURE AND WEAR DATE REMARKS SIGNATURE ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….…. ………………………………………………………………. ………………….. ……../….…./….….
TRENCHER TZ S 8.2- EXTRAORDINARY MAINTENANCE This is the set of activities performed in order to maintain the conditions of use and operation of the machine, by means of various types of activities (cleaning, adjustments, replacements, etc.) exclusively performed by the manufacturer or in case of failure or wear.
TRENCHER TZ S INSTRUCTIONS FOR LIFTING THE MACHINE Width 745 mm Length 1325 mm Height 855 mm 133 kg BEFORE LIFTING AND HANDLING THE MACHINE, AUTHORISED OPERATORS MUST READ AND UNDERSTAND ALL OF THE FOLLOWING INSTRUCTIONS. MAKE SURE THAT, DURING OPERATIONS, THERE ARE NO PEOPLE, ANIMALS AND/OR OBJECTS IN THE WORK AREA THAT MAY SUFFER HARM OR DAMAGE.
Page 69
TRENCHER TZ S 10.2- HAND SIGNALS (DIRECTIVE 92/58/EEC) A. GENERAL SIGNALS Both arms are extended horizontally with the palms facing forward. - START - ATTENTION - START OF COMMAND The right arm points upwards with the palm facing forwards. - STOP...
TRENCHER TZ S 11- SPARE PARTS 11.1- GENERAL WARNINGS ORIGINAL SPARE PARTS FOR ANY REPLACEMENTS MUST BE EXCLUSIVELY ORDERED FROM THE MANUFACTURER OR AUTHORISED DEALER. IT IS STRICTLY FORBIDDEN TO REPLACE COMPONENTS WITH UNORIGINAL SPARE PARTS. 11.2- ORDERING – INDEX TO SPARE PARTS TABLES.
Need help?
Do you have a question about the TZ S and is the answer not in the manual?
Questions and answers