Download Print this page

SMA Powerline Kit Brief Instruction page 13

Powerline communication for sunny mini central

Advertisement

Available languages

Available languages

Sunny Mini Central – Installation of the Powerline Kit
Plug the modules into the slots described in figure 3. Make sure that the Piggy-Back is plugged on in the right
position. Be careful not to bend any pins or to damage the module. Do not use brute force.
Plug the PLC power unit into the slot. The PLC power unit must audibly lock into place. Do not use brute force.
Insert the plug connector into the free slot of the PLC power unit.
Plug the
Piggy-Back into
the slot.
Closing the Enclosure
Close the Sunny Mini Central and reconnect it to the DC and AC voltage. Pay attention to all safety relevant
instructions in the installation manual of the Sunny Mini Central.
www.SMA.de
2 3 5 7
+
+
+
+
-
-
MC
MC
MC
MC
Figure 3: Insertion of the Modules of the Powerline Kit
E-Total 124.4kWh
h-Total
512h
S2
S2
S1
S1
A
A
B
B
A
A
B
B
C
B
A
SMC60-AST
-
-
N
L
230 Vac:
N
L1
MC
MC
MC
MC
Page 5 of 5
Brief Instruction
Plug the
PLC power unit
into the slot
Insert the plug
connector into the
free slot of the
PLC power unit.
PE
SMA Technologie AG
Hannoversche Str. 1-5
34266 Niestetal

Advertisement

loading

This manual is also suitable for:

Nlmpb-smc-nr