Final Checks (With The Burner Working) - Riello RS 250/EV Installation, Use And Maintenance Instructions

Forced draught gas burner, progressive two stage or modulating operation.
Table of Contents

Advertisement

5.6

Final checks (with the burner working)

 Open the control limit operation
 Open the high limit operation
 Rotate the maximum gas pressure switch knob to the mini-
mum end-of-scale position
 Rotate the air pressure switch knob to the maximum end of
scale position
 Switch off the burner and disconnect the voltage
 Disconnect the minimum gas pressure switch
 Cover the QRI flame sensor
Make sure that the mechanical locking systems on
the different adjustment devices are fully tightened.
WARNING
20044771
Start-up, calibration and operation of the burner
32
The burner must stop
The burner must stop in lockout
The burner must not start
The burner must stop in lockout due to firing failure
GB

Advertisement

Table of Contents
loading

This manual is also suitable for:

20044529

Table of Contents