Preparations; Installation Site; Factory Settings - STIEBEL ELTRON DHE 18 SL LABS Operation And Installation

Instantaneous water heater with full electronic control
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATIoN

preparations

8.
Preparations
f Flush the water line thoroughly.
f
Taps
f Use suitable taps (see chapter "Appliance description / Ac-
f
cessories"). Open taps are not permitted.
A safety valve is not required.
Note
Never use the cross-piece to reduce the flow rate. It is
intended to shut off the appliance.
Permissible water pipe materials
- Cold water inlet pipe:
Galvanised steel pipe, stainless steel pipe, copper pipe or
plastic pipe
- DHW outlet pipe:
Stainless steel pipe, copper pipe or plastic pipe
Material losses
!
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum pres-
sure (see chapter "Specification / Data table").
Flow rate
f Ensure that the flow rate (see chapter "Specification / Data
f
table", On) for switching on the appliance is achieved.
f Increase the mains water pressure if the required flow rate is
f
not achieved with the draw-off valve fully opened.
Flexible water connection lines
f If the appliance is installed with flexible water connection
f
lines, ensure that the pipe bends do not become twisted.
Pipe bends have a bayonet fitting and are installed inside the
appliance.
f Secure the back panel at the bottom with an additional
f
screw.
8.1

Installation site

Material losses
!
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically near the draw-off
f
point.
The appliance is suitable for undersink and oversink installations.
Note
The appliance must be fitted to a wall with sufficient load
bearing capacity.
www.stiebel-eltron.com
Undersink installation
e l e c t r o n i c c o m f o r t
1 Cold water inlet
2 DHW outlet
Oversink installation
e l e c t r o n i c c o m f o r t
2
1 Cold water inlet
2 DHW outlet
8.2

Factory settings

The appliances are prepared in the delivered condition:
- Electrical connection from below, installation on unfinished
walls
- Water connection, installation on unfinished walls
- The middle connected load is preset.
1
2
1
DHE SL LABS |
23

Advertisement

Chapters

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Dhe 21 sl labsDhe 24 sl labs

Table of Contents