Download Print this page

Advertisement

Quick Links

OPERATION INSTRUCTIONS
FOR THE Arai GP-6S
READ THESE INSTRUCTIONS BEFORE USE!
TO FASTEN CHINSTRAP
For proper fastening the chinstrap must be
routed through the D-rings as illustrated,
and pulled through them securely for a
snug fit.
Chinstrap
D-ring
A D-ring release tab is provided to make
loosening of the strap easier, simply pull
as illustrated.
TO OPERATE FACE SHIELD
To open the shield, push up the shield
lock release lever to release the lock sys-
tem.
Then raise the shield. The shield can
only be opened when the lock system has
been so released.
To close the shield, push down the shield
until it is locked in place.
D-ring Release Tab
Shield Lock Release Lever
To remove the shield, remove
screws, washers and guides
from the helmet. To replace,
position the shield in place
and install guides, washers
and screws as illustrated.
Tear-Off posts are standard equipment. To
install the Tear-Off, some Tear-Offs come
with protective film on one or both sides.
Be sure to remove any films that may be
present. Slip the hole of the shorter end
over the right shield post. Lay the Tear-Off
across the shield and slip the other hole
over the left shield post.
Arai Tear-Off posts are eccentrically mounted so as to be adjustable to better ac-
cept looser or tighter Tear-Offs. Adjust both posts by rotating them so that the
Tear-Off is taut across the shield but not too tight so as to rip or distort the Tear-
Off.
Then tighten the posts from behind with
a Phillips head screwdriver while holding
the posts firmly in place with your, or an
assistant's fingers. The posts are loose
when shipped, so be sure to tighten them
before use even if the Tear-Offs fit without
adjustment.
TO OPERATE TOP VENTILATION DUCTS
Push the switch on each duct to open/close the ducts as illustrated.
Open
Close
Specifications Subject to Change Without Notice.
Contacts:
Short Screw
Long Screw
Note the Right and Left
L
R
ARAI HELMET, LIMITED
12 Azuma-cho, 2-Chome
Ohmiya, Saitama
JAPAN 330-0841
ARAI HELMET AMERICAS, INC.
P.O. Box 787
Fogelsville, PA 18051-0787
U.S.A.
ARAI HELMET (EUROPE), B.V.
P.O. Box 112
3870 CC Hoevelaken
THE NETHERLANDS

Advertisement

loading

Summary of Contents for Arai GP-6S

  • Page 1 Arai Tear-Off posts are eccentrically mounted so as to be adjustable to better ac- D-ring cept looser or tighter Tear-Offs. Adjust both posts by rotating them so that the Tear-Off is taut across the shield but not too tight so as to rip or distort the Tear- Off.
  • Page 2 DELTA DUCT-5 INTAKE DUCT WHITE 104901 If the part you need is not listed, probably due to being from a design introduced after this instruction leaflet was printed, contact your Arai dealer or the nearest Arai representative office listed overside for current availability.