Fortress Technologies PURE VIEW GLASS BALUSTER FOR Fe26 STEEL Installation Instructions Manual page 38

Table of Contents

Advertisement

Available languages

Available languages

Tip:
• Be sure to wear safety gloves and goggles when handling
Glass.
Fig. 1
Step 3:
Install Top Rail
1. Carefully slip Top Rail over the top of the Balusters into the
top Bracket Cups.
2. A Rubber Mallet might be needed to complete installation.
If using a Rubber Mallet, use a cloth to protect the Top Rail
Cap and Top Rail Cap Spacer from damage.
3. Pre-drill Bracket Cup holes for screws using a 3/16"
[89.5mm] drill bit.
4. Secure top rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
Fig. 1
STAIR BRACKET: BRACKET CAP, PRESSED DOME/BALL CAP &
• Reference Bracket Cap, Post Cap & Post Base Cover
installation instructions on pages 14 & 15.
38
Fig. 2
POST BASE COVER INSTALLATION
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26

Advertisement

Table of Contents
loading

Table of Contents