Fortress Technologies PURE VIEW GLASS BALUSTER FOR Fe26 STEEL Installation Instructions Manual page 31

Table of Contents

Advertisement

Available languages

Available languages

Step 2:
Bottom Bracket Installation Continued (UB or CB)
1. Use Spring Punch to mark the holes. As shown in Fig. 1.
2. Drill out bracket hole with a 3/16" drill bit.
As shown in Fig. 2.
3. Use T-25 screws to attach the UB or CB base to the post.
Begin with top hole then bottom. As shown in Fig. 3.
4. Keep bracket base centered as you install second screw.
5. Insert barrel & screw to re-assemble bracket.
6. Tighten barrel & screw. As shown in Fig. 4 & 5.
7. Use T-25 screws to attach UB-05 Bracket to UB-05 Adapter.
As shown in Fig. 6.
Note:
• Lower Post may need to be unmounted to install bracket
then remounted.
Fig. 1
Fig. 3
Fig. 4
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Fig. 2
UB-05 Stair
Bracket
31

Advertisement

Table of Contents
loading

Table of Contents