Fortress Technologies PURE VIEW GLASS BALUSTER FOR Fe26 STEEL Installation Instructions Manual page 17

Table of Contents

Advertisement

Available languages

Available languages

COLLAR BRACKET: BRACKET INSTALLATION
Step 1:
Mark Bracket Hole Locations
• Reference Bracket hole marking instructions on page 7.
Fig. 1
Pre-drill Dimensions: Pre-drilling with a 3/16"[4.5mm] drill bit is required
A*
34" [864mm] Panel
3-3/16" [81mm]
40" [1016mm] Panel
3-3/16" [81mm]
*Dimension A positions bottom edge of rail 3-3/4" [95.5mm] above deck surface.
*Dimension A is measured from the bottom surface of post base.
Fig. 2
C
B
C
Step 2:
Pre-Drill Bracket Holes
• Reference Bracket hole pre-drilling instructions on page 8.
Note:
• DO NOT install Brackets in this step.
Step 3:
Measure The Panel Opening Length
• Reference Panel opening instructions on page 9.
COLLAR BRACKET: CUTTING DOWN TOP & BOTTOM RAILS
• Reference pages 10 & 11 for rail cutting & spray painting steps.
CB-05 Bracket Hole Locations
30-5/8" [778mm]
36-1/2" [925mm]
A
C
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
B
C
2-1/2" [63mm]
2-1/2" [63mm]
A
17

Advertisement

Table of Contents
loading

Table of Contents