Download Print this page

Toro 08731 Operator's Manual page 7

Midmount toolbar system sand pro/infield pro 3040 and 5040 traction unit

Advertisement

Figure 11
1. Toolbar
2. Pivot bracket
1. Position each end of the attachment tube onto the
saddles.
Note: The cutting edges of the tines should point
forward.
2. Move the lift handle to the middle position.
3. Secure the front of each saddle to the tube assembly
with a bolt (5/16 x 1 inch) and a locknut (5/16 inch)
(Figure 12).
Figure 12
1. Saddle
3. Fourth tooth
4. Tooth mounting hardware
2. Attachment tube
7
Installing the Toolbar Lift Pedal
Parts needed for this procedure:
1
Lever assembly
1
Bolt (5/16 x 2 inches)
3
Locknut (5/16 inch)
1
Pivot tab
1
Toolbar link
1
Carriage bolt (3/8 x 1-1/4 inches)
1
Spacer
1
Washer (1 inch)
1
Locknut (3/8 inch)
1
Pedal lever assembly
2
Retaining ring
1
Washer (7/8 inch)
1
Bolt (5/16 x 1 inch)
1
Eccentric bolt
Procedure
1. Slide the post on the lever assembly into the left end
of the pivot tube, and secure it with a bolt (5/16 x 2
inches) and a locknut (5/16 inch) through the pivot
tube (Figure 13).
Note: You may need to thread the bolt through the
pivot tube and the lever assembly.
7

Advertisement

loading