Download Print this page

Toro 08731 Operator's Manual page 4

Midmount toolbar system sand pro/infield pro 3040 and 5040 traction unit

Advertisement

1. Handle lift assembly pivot
10. Check the clearance between the lift handle assembly
and the hydraulic line.
Note: There must be a minimum clearance of 1/8
inch between the hydraulic line and the lift handle
assembly. Gently position the hydraulic line as required
(Figure 2).
3
Installing the Pivot Tube and
the Tension Spring
Parts needed for this procedure:
1
Pivot tube
1
Extension spring
1
Spring rod
2
Pivot tube bracket
4
Bolt (3/8 x 3 inches)
6
Locknut (3/8 inch)
1
Spring bracket
1
Bolt (3/8 x 2-3/4 inches)
Procedure
Note: If you will be installing the spring tine toolbar, install
the pivot tube brackets supplied with the spring tine toolbar
instead of the ones supplied with this attachment. Refer to the
Spring Tine Toolbar Installation Instructions for more information.
1. Connect the extension spring to one of the spring
levers on the pivot tube and to the spring rod (Figure 5).
Figure 4
2. Locknut
1. Locknut (3/8 inch)
2. Pivot tube bracket
3. Bolt (3/8 x 3 inch)
4. Pivot tube
2. Loosely install the pivot tube bracket onto the right
side (Figure 5).
3. Slide the right-hand side of the pivot tube into the right
side pivot tube bracket (Figure 5).
4. Insert the spring rod into the hole in the spring bracket,
and loosely secure it with a locknut (3/8 inch).
Note: Position the spring rod as shown in Figure 6.
1. Extension spring
2. Spring rod
3. Locknut (3/8 inch)
5. Raise the left-hand side of the pivot tube to the frame
and install it with a pivot tube bracket, 2 bolts (3/8 x 3
inch), and 2 locknuts (3/8 inch) (Figure 5).
6. Mount the spring bracket to the front frame tube with
a bolt (3/8 x 2-3/4 inch) and a locknut (3/8 inch).
Note: Position the spring bracket as shown in Figure
6.
4
Figure 5
5. Extension spring
6. Spring rod
7. Front of machine
Figure 6
4. Frame
5. Spring bracket
6. Bolt (3/8 x 2-3/4 inch)

Advertisement

loading