Celestial 900 Metal Framing Information; Construct Framing; Insert Unit And Connect Flues; Line Framing With Villaboard - Kemlan CELESTIAL 900 Installation & Operating Instructions Manual

Table of Contents

Advertisement

1. CONSTRUCT FRAMING

950 MM
VERTICAL
OPENING
200 MM
.
MIN
1130 MM HORIZONTAL
OPENING

3. LINE FRAMING WITH VILLABOARD

LOWEST FIXING
POINT 400MM
ABOVE HEAT
DUCTING BOX
20/08/2020
CELESTIAL 900
METAL FRAMING INFORMATION
DISTANCE BETWEEN
HEAT DUCTING BOX

2. INSERT UNIT AND CONNECT FLUES

25 MM CUT OUT
CLEARANCE AROUND
10" FLUE
METAL FRAMING
ONLY TO BE USED
FOR THE
CONSTRUCTION
400MM MIN.
AND METAL
FRAMING
NO CAPPING
REQUIRED ON OPEN
HEAT ZONE VENTS
460 MM
DEPTH
4. ATTACH FASCIA AND AIR VENTS
CEILING
MIN. 9mm FIBRE
CEMENT SHEETING
MUST BE USED FOR
WALL LINING
WARNING: FIXING
WALL LINING WITHIN
THIS AREA COULD
LEAD TO MATERIAL
CRACKING
FASCIA
ver. 29
CEILING
TRIPLE FLUE
KIT
MINIMUM
1 FLEXIBLE
HOSE TO
VENTS MUST
BE INSTALLED
50 MM MIN.
DISTANCE
BETWEEN
HEAT DUCTING
BOX AND
METAL
FRAMING TYP.
TRIPLE FLUE
KIT
HEAT ZONE
VENT
SUPPLIED,
NOT TO BE
INSTALLED TO
AN OUTSIDE
WALL
( INTERNAL
ONLY)
2x AIR VENTS
SUPPLIED
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents