ABB AC 900F Mounting And Installation Instructions Manual page 104

Process automation freelance 2016
Table of Contents

Advertisement

Controller configuration via terminal program
In case of an invalid entry, the boot loader repeats this configuration item. When the
entry is correct, the real-time clock is started.
RTC time: 22.07.08, 00:17:02 local
Date and time must be precisely set during first commissioning of the AC 900F.
Identification PIN
Select the <P>in menu item in order to define an identification PIN.
Enter a four-digit PIN. Confirm the PIN by entering it once again. The PIN prompt
is deactivated when 0000 is entered.
The PIN-protected menus and functions are listed in section 8 (Security).
Change PIN (ESC for no change, 0000 to clear)
Enter new PIN: 1234
Confirm PIN:
PIN changed
Starting the operating system
When the above configuration is completed (or upon expiry of the waiting time),
select the <B>ooting menu item. The boot loader attempts to start an existing
operating system or project configuration, if any, or waits for bootstrapping by the
Engineering Station.
104
1234
Section 7 Commissioning
M&I – AC 900F Controller

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents