Loading The Nailer; Operation - Makita AN510H Instruction Manual

Construction nailer
Hide thumbs Also See for AN510H:
Table of Contents

Advertisement

ASSEMBLY
CAUTION:
Always disconnect the air hose before loading the
nailer.

Loading the nailer

CAUTION:
Make sure that the coil support plate is set to the
correct step for used nails.
009361
Disconnect the air hose from the tool. Select nails
suitable for your work. Depress the latch lever and open
the door and magazine cap.
Select nails suitable for your work. Depress the latch
lever and open the magazine cap.
Lift and turn the coil support plate so that the arrow with
nail size indicated on the coil support plate will point to
the corresponding graduation increment marked on the
magazine. If the tool is operated with the coil support
plate set to the wrong step, poor nail feed or malfunction
of the tool may result.
1
009362
Place the nail coil over the coil support plate. Uncoil
enough nails to reach the feed claw. Place the first nail in
the driver channel and the second nail in the feed claw.
Place other uncoiled nails on feeder body. Close the
magazine cap slowly until it lock after checking to see
that the nail coil is set properly in the magazine.
1. Lever
2. Door
1
2
1. Arrow
2. Adjustfit
2
3. Change plate
3
1
2
009363
Connecting air hose
Slip the air socket of the air hose onto the air fitting on
the nailer. Be sure that the air socket locks firmly into
position when installed onto the air fitting. A hose
coupling must be installed on or near the tool in such a
way that the pressure reservoir will discharge at the time
the air supply coupling is disconnected.

OPERATION

CAUTION:
Make sure all safety systems are in working order
before operation.
1.
To drive a nail, you may place the contact element
against the workpiece and pull the trigger, or
1
009359
1
009360
2.
Pull the trigger first and then place the contact
element against the workpiece.
No. (1) method is for intermittent nailing, when you
wish to drive a nail carefully and very accurately.
No. (2) method is for continuous nailing.
7
1. Door
2. Nail guide
3. Feeder
3
1. Contact element
2. Trigger
2
1. Contact element
2. Trigger
2
3. Workpiece
3

Advertisement

Table of Contents
loading

Table of Contents