3. While still holding down the A DMIN button, reconnect the power, and continue
to hold the button for another 15 seconds. You should see two POWER LEDs light
up in the top left corner.
4. Wait 15 minutes before
Figure 22 : ADMIN button on Controller Board (left) and Core Board (right)
PROVISIONING THE ACU
Provisioning the ACU means registering it in the Control Center and getting it up and
running with the latest firmware. You will need to re-provision in the case of
RESETTING THE ACU
Note: If you're provisioning ACUs for a customer account, the customer org will need
to be created by Openpath first.
REQUIREMENTS
● Meet all
N ETWORK
● Connect the ACU to the Internet via Ethernet
● Install the Open Admin app
iOS App
○
Google Play
○
Version 1.8
P ROVISIONING THE
.
REQUIREMENTS
Store
Store
© Openpath 2020
ACU
Page 29
Need help?
Do you have a question about the OP-SH-24V and is the answer not in the manual?
Questions and answers