Openpath Access Control System Installation Guide 
GETTING STARTED 
ADDITIONAL RESOURCES 
PRIOR TO INSTALLATION 
Installation 
NETWORK REQUIREMENTS 
SELECTING A BACKUP BATTERY 
MOUNTING INSTRUCTIONS 
INSTALLING CORE SERIES BOARDS IN E1 ENCLOSURE 
INSTALLING CORE SERIES BOARDS IN E2 ENCLOSURE 
INSTALLING CONTROLLER BOARD WITH 24V LOCKING HARDWARE 
INSTALLING CONTROLLER BOARD WITH 12V LOCKING HARDWARE 
WIRING OPENPATH READERS 
STANDARD CONFIGURATIONS 
WIRING THE CORE SERIES 24V SMART HUB - 4ENT-SYS-24V 
WIRING THE CORE SERIES 24V SMART HUB - 20ENT-SYS-24V 
ELEVATOR BUTTON WIRING 
GENERAL PURPOSE INPUTS 
WIRING THE CORE SERIES 12/24V SMART HUB - 4ENT-SYS-1224V 
WIRING THE CORE SERIES 12/24V SMART HUB - 8ENT-SYS-1224V 
WIRING WITH THE 12/24V POWER SUPPLY 
WIRING THE REX WITH THE DOOR STRIKE 
WIRING THE REX WITH THE ELECTROMAGNETIC LOCK 
WIRING FAIL SAFE AND FAIL SECURE LOCKING HARDWARE 
WIRING THE OPENPATH ELEVATOR BOARD TO A STANDALONE CONTROLLER BOARD 
ADVANCED CONFIGURATIONS 
CHANGING I/O TYPES 
WIRING TO LEGACY PANELS AND MOBILE GATEWAY 
WIRING TO WIEGAND DEVICES ON CORE SERIES SMART HUBS 
END-OF-LINE SUPERVISION 
Troubleshooting 
ACU LEDS 
READER LEDS 
LEGACY WIRING 
RESETTING THE ACU 
SOFT RESET 
HARD RESET 
To hard reset the ACU: 
PROVISIONING THE ACU 
REQUIREMENTS 
CREATE ACU IN CONTROL CENTER 
Regulatory 
UL 294 
CAN/ULC 60839-11-1-16 GRADE 1 
FCC 
IEC 62368-1 
RF Radiation Hazard Warning 
Industry Canada Notice and Marking 
Warnings 
Technical Specifications 
 
 
Version 1.8 
 
©​ Openpath 2020 
 
Page 2 