Led Behavior; Prerequisite - Dell Neworking S6000-ON Installation Manual

Open networking
Hide thumbs Also See for Neworking S6000-ON:
Table of Contents

Advertisement

1
Serial Console
2
Master LED
3
Power LED
4
Fan Status LED
5
Locator LED
6
Stack ID
7
USB-A
8
USB-B Console
9
Management

LED behavior

The following S6000–ON system LED behavior is seen during ONIE operations:
Table 1. LED behavior
LED
System Status LED
Master LED
Fan LED
Power Status LED
Locator LED

Prerequisite

The following is a list of components required for a successful installation of the S6000-ON.
NOTE:
Detailed installation instructions for the S6000-ON are provided in
S6000–ON chassis
AC cables to connect the AC power source to each of the chassis' AC power supplies (country/regional configured)
Mounting brackets for rack installation (included)
Screws for rack installation and #1 and #2 Phillips screwdrivers (not included)
Ground cable (not included, optional)
Ground cable screws (included)
Description
Off—no power
Blinking green—booting or system is in Diagnostic mode
Solid green—normal operation
Solid red—critical alarm
Blinking red—noncritical alarm
Solid green—system is in Stacking Master mode
Off—system is in Slave mode
Solid green—fan is powered on and running at the expected
RPM
Solid yellow—fan failed including incompatible airflow direction
Off—no power
Solid green—normal operations
Blinking yellow—a power supply has failed
Off—locator function is disabled
Blinking blue—locator function is enabled
Site Preparations
and
Install the
S6000-ON.
The S6000–ON system
9

Advertisement

Table of Contents
loading

Table of Contents