Checking Installation; Identifying Hardware And Software Version; Checking Mounting; Energizing The Ied - ABB Relion 650 Series Installation Manual

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 514 014-UUS A
Section 7
7.1

Identifying hardware and software version

Hardware and software version information can be found from the label that is attached on the
case of the IED. There is also module labels that can be used to identify modules inside the IED.
7.2

Checking mounting

Check that all fixing screws are tight and that all cables are connected.
7.3

Energizing the IED

Before you connect the auxiliary power, check that the terminal strip is wired and placed correctly.
During the start-up all LEDs are lit for a short period.
Green Normal LED starts to flash
LCD lights up and starting... is displayed
The main menu is displayed. A steady green Normal LED indicates a successful start-up.
If the IED detects a diagnostic error during start up, the green Normal LED flashes and the internal
fault code is displayed on the LCD.
Table 4:
Battery Supervision BATS
Station Battery
Active
Active
650 series
Installation manual

Checking installation

Supervision Power Supply
Output Ready
Active
Active
© Copyright 2011 ABB. All rights reserved
Logic
Led Battery
1
On
0
Off
0
On
0
Off
Checking installation
GUID-C5B48E09-7963-453C-B308-A52085B3F359 v1
GUID-50578D7B-23D4-45B0-BB10-D3108EEF9B97 v1
GUID-11B42B1B-A6EF-4A04-81B1-1305066621F1 v6.1.1
VS+ (output voltage)
VS+ Supervision
VS+ Output
> 15.1 V
> 33.5 V
< 14.6 V
> 33.5 V
> 15.1 V
< 32.9 V
< 14.6 V
< 32.9 V
Section 7
41