Rack Mounting Two Ieds - ABB Relion 650 Series Installation Manual

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Section 5
Mounting
5.3.2.2

Rack mounting two IEDs

1.
Remove the plastic plugs from the side of the case on both of the two IEDs.
2.
Locate the pins on the two middle mounting brackets to the holes on the sides of the two
IEDs.
3.
Mount the upper and lower mounting brackets to the two IEDs using the screws at the
required location.
Make sure that the lower venting hole on the IEDs line up with the venting hole in the lower
mounting bracket.
5
GUID-36783A5D-1F19-45B1-88E7-D1B18912A451 V1 EN-US
Figure 7:
1
2 Vent holes
3 Right mounting bracket
4 Lower mounting bracket
5 Screws
6 Left mounting bracket
7 Middle mounting brackets
4.
Tighten the screws.
5.
Mount the left and right mounting brackets to both sides of the IED assembly using fixing
screws.
24
2
1
4
5
Mounting IEDs
Upper mounting bracket
© Copyright 2011 ABB. All rights reserved
6
7
1MRK 514 014-UUS A
GUID-3E10B635-AB42-44B0-BDA2-9B7BDAC8FC8E v2
3
650 series
Installation manual

Advertisement

Table of Contents
loading

Table of Contents