Storing - ABB Relion 650 Series Installation Manual

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Section 4
Unpacking, inspecting and storing
4.3

Storing

If the IED is stored before installation, it must be done in the original transport casing in a dry and
dust free place in accordance with ANSI C37.90.0. Observe the environmental requirements stated
in the technical manual.
18
© Copyright 2011 ABB. All rights reserved
1MRK 514 014-UUS A
GUID-1DC9D33D-DC62-438B-9333-3BB354164CBC v5
650 series
Installation manual

Advertisement

Table of Contents
loading

Table of Contents