Rack Mounting (1950M Monitors) - Allen-Bradley 6176M-15VN User Manual

Standard industrial monitors
Table of Contents

Advertisement

7. Tighten the mounting clips to a torque of 1.1 N•m (10 lb•in) by following
the torque sequence in
ATTENTION: Tighten the mounting clips to the specified torque to
provide a proper seal and prevent damage to the monitor. Rockwell
Automation assumes no responsibility for water or chemical damage to
the monitor or other equipment within the enclosure because of
improper installation.
8. Repeat the torque sequence at least three times until all mounting clips are
torqued to 1.1 N•m (10 lb•in) and the sealing gasket is compressed
uniformly against the panel.

Rack Mounting (1950M monitors)

The 1950M monitor is installed directly into a standard 19-inch rack.
Make sure there is adequate space behind the rack panel. Allow minimum
clearances for cables and airflow. See
Mount the 1950M Monitor in a Rack
Follow these steps to mount the 1950M monitor in an EIA-rack cabinet.
1. Position the monitor into a standard 19-inch EIA-rack cabinet (A) as
shown in
Figure 2 on page
TIP
2. Slide the two clips into the first slots on the sides of the monitor (B).
3. Tighten the clips to a torque of 1.1 N•m (10 lb•in) (C).
4. Slide the remaining clips into the slots on the sides of the monitor (D).
5. Tighten the remaining clips to a torque of 1.1 N•m (10 lb•in) (C).
Rockwell Automation Publication 6176M-UM001D-EN-P - December 2012
Figure 1 on page
16, making sure to not overtighten.
Panel Mounting Guidelines on page
18.
For ease of installation, make sure two or more people help to install
the monitor.
Installation
Chapter 2
16.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents