Required Tools; Mounting Clearance Requirements - Allen-Bradley 6176M-15VN User Manual

Standard industrial monitors
Table of Contents

Advertisement

Chapter 2
Installation

Required Tools

Mounting Clearance
Requirements
14
These tools are required for installation:
• Panel cutout tools
• #2 Phillips torque screwdriver
Review the monitor dimensions to make sure you allow adequate clearance
around the monitor for ventilation and cable connections.
1
2
4
IMPORTANT Do not operate the monitor in an enclosure that uses minimum clearances
unless adequate ventilation or other cooling methods are used to maintain
the monitor temperature at its specified rating.
The ambient temperature around the monitor must not exceed the operating
temperature specified in
Rockwell Automation Publication 6176M-UM001D-EN-P - December 2012
3
Item Monitor Location
1
Top
2
Side (both)
3
Back
4
Bottom
Table 13 on page
42.
Clearance, min
77 mm (3 in.)
50 mm (2 in.)
50 mm (2 in.)
50 mm (2 in.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents