Cable Termination - NEC PASOLINK Training Course

Digital microwave radio system
Table of Contents

Advertisement

NEC
PASOLINK installation procedure

Cable Termination:

In the following, list of tools and material and the method for cable termination are described.
The following cables are described for reference.
• BNC connector
• D-sub connector
• N-P connector
• Molex M5557-4R connector
Note: Use ISO standardized screw (mm unit) for D-SUB connector.
The necessary tools and materials are summarized as follow.
Tools and Material List
1 Soldering Iron
2 Knife
3 Measure
4 Wire Stripper
5 Adjustable Wrench
6 Hand Crimping Tool (CL250-0012-2/CL250-0013-5)For D-Sub connector
(57026-5000/57027-5000)For Molex connector
7 Solder
January 2002

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents