Panasonic DVC PRO Studio AJ-D950P Service Manual page 6

Vtr/analog video interface kit
Table of Contents

Advertisement

Name
Tape Path
Cleaning
1
Cylinder Unit
2
Pinch Arm Unit
3
Cleaning Arm
Unit
4
S Reel Motor A
Unit
5
T Reel Motor A
Unit
6
Thrust Screw
Unit
7
S Loading Arm
Unit
8
T1 Boat Unit A
9
S Post Base A
Unit
10
Tension Arm S
Unit
11
Cassette
Compartment
12
Mech. Chassis
Unit
13
Fan Motor
Note:
Hours of Use are based on the head rotation hours.
Hours of Use are recommendation. It may depend on temperature, humidity or dust.
Hours of Use are listed as the reference of maintenance. They do not mean guaranteed hours.
"R": These parts are replacement parts.
"r": These parts are included in Mech. Chassis Unit. Replacing Mech. Chassis Unit is
recommended.
*1. The lubrication is necessary when replacing the Pinch Arm Unit. (Use Molytone Grease.)
"C": This mark means cleaning is necessary. Detail cleaning procedures are written in Service
Manual.
The following parts are included in the mechanism chassis. Therefore usual replacement is not
necessary if the mechanism chassis is replaced.
Part No.
Hours of Use (unit hours)
2,000
"C" Clean the Tape Path at each 500 hours
VEG1457
R
VXL2835
R*1
VXL2748
R
VEM0635
VEM0636
VXQ0556
VXL2812
VXA6108
VXA6052
VXL2832
VXA6070
VXY1318Z1
VRF0193
Replace the Fan Motor at each 10,000 hours
Operation Time
4,000
6,000
8,000
R
R
R
R*1
R*1
R*1
R
R
R
R
R
R
R
R
R
R
R
R
R
6
10,000
12,000
R
r
R*1
r
R
r
r
r
r
r
r
r
r
r
R

Advertisement

Table of Contents
loading

Table of Contents