Download Print this page

Energetics ET 210 Manual page 9

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Step 2
(e)
52L
(d)
13
1. Put the upper tension cable (25) into hole of the handlebar post (10), fix the tension by a Bolt
and curved washer as Fig a-1 and Fig a-2
2. Connect upper tension cable (25) and Lower tension cable (27), upper computer cable (28) and
lower computer cable (29). Assemble the handlebar post onto the main frame (1) by curved
washer (6), spring washer (7) and allen bolt (9).
3. Assemble the Left & Right moveable supporting tube(52L&R) to Moveable handlebar support
(13) by curved washer (6), spring washer (7) and allen bolt (9).
(a)
52R
35
28
25
29
27
1
9
7
6
B
(x8)
a-1
25
10
(c)
(b)
9
a-2
25
27

Advertisement

loading