Page 1
Seattle 4Ft6 Assembly Instructions 2177450 - Please keep for future reference 2376000 Dimensions Tip : To prevent damage, we recommend that you Width - 166,9cm build your unit on the Depth - 195,4cm Height - 95,0cm carton(s) it was packed in.
Safety and Care Advice Important – Please read these instructions fully before starting assembly • Check you have all the • Do not stand or put weight on •To reduce the likelihood of components and tools listed on the product, this could cause damaging your pages 2 and 3.
Page 3
Components - Panels If you have damaged or missing parts, call the Customer Helpline: 03456 400 800 Please check you have all the panels listed below Left & Right plinth x 2 (191,0x15,0cm) FA2530 Head board (136.5x 51.7cm) Left & right rail X2 FA2533 (191.0x 22,0cm) P2040...
Page 4
Components - Fittings Please check you have all the fittings listed below Note: The quantities below are the correct amount to complete the assembly. In some cases more fittings may be supplied than are required. FK1012 FK1011 FK1411 15mm Large locking nut x 68 Locking screw x 32 Wood dowel x 40 (15x12mm)
Page 5
Assembly Instructions Step 1 Foot end assembly Insert 6x wood dowel C with a smal amount of glue H into the holes of foot board 5. Insert 3x large locking nut A and 3x double lockinginto screw K into leg foot right side 8. Use a screwdriver to turn 3x large locking nut A clockwise to lock.
Page 6
Assembly Instructions Step 1 - continued Foot end assembly Attach leg foot right side 8 and leg foot left side 9 on foot board 5 using 6x Large locking nut Use a screwdriver to turn 6x large locking nut A clockwise to lock. Screw 8x locking screw Binto the holes on leg foot side right 8, foot...
Page 7
Assembly Instructions Assembly Instructions Step 2 Step x - continued Side assembly Xxxxxx Insert 4x wood dowel C with a smal amount of glue H into the holes of left & right rail 3. Attach support rail 0 with 9x chipboard srews I to left &...
Page 8
Assembly Instructions Assembly Instructions Step x Step 3 Xxxxxx Mid pannels assembly Insert 2x wood dowel C with a smal amount of glue H into the holes of mid rail ^. Insert 4x large locking nut A into the holes of mid rail ^.
Page 9
Assembly Instructions Step 4 Head end assembly Insert 8x wood dowel C with a smal amount of glue H into the holes of head board 1 and head pannel 4. Note: We recommend to build this part on the packiging cartons to prevent damage to your product.
Page 10
Assembly Instructions Step 4 - continued Head end assembly Apply a smal amount of glue H onto wood dowel C already fixed into head board 1 and head pannel 4. Attach leg head right side 6 and leg head left side 7 to head panel 4 and head board 1 with 12x large locking nut A.
Page 11
Assembly Instructions Step 5 Final assembly 2 people required! Glue dowels. Attach the left and right rail and mid pannels to the foot board with 8x locking nuts A. Use a screwdriver to turn 8x locking nut A clockwise to lock. Continued on next page.
Page 12
Assembly Instructions Step 5 - continued Final assembly 2 people required! Glue dowels attach the left and right side and mid pannels to the foot board with 8x locking nut A. Use a screwdriver to turn 8x large locking nut A clockwise to lock.
Page 13
Assembly Instructions Step 5 - continued Final assembly Attach 4x connector bracket L with each 4x Back panel screw D on the corner of left & right rail 3, head pannel 4 and foot board 5...
Page 14
Assembly Instructions Step 6 Drawer assembly Insert 2x wood dowel C with a smal amount of glue H and screw 4 locking screw B into drawer back #. Apply a smal amount of glue H onto 2x wood dowel C already fixed onto drawer back #.
Page 15
Assembly Instructions Step 6 - continued Drawer assembly Attach Drawer base $ with 21x carcase srew E to left & right drawerside @ & drawer back #. Insert 2x wood dowel C with a smal amount of glue H and screw 4x locking screw B into drawer front !.
Page 16
Assembly Instructions Step 6 - continued Drawer assembly Apply a smal amount of glue H onto 2x wood dowel C already fixed onto drawer front !. Attach left & right drawer side @ onto drawer front !, insert 4x large locking nut A into left &...
Page 17
Assembly Instructions Step 7 Slats and drawers Attach adult 4 ft 6 slats to support beam 0 with 8x chipboard screws M roll the 2 drawers under the bed. Attach 3X smal connecting plate J on back of head end with each 4x back pannel screws D The assembly is now...