EIP Ebac PP6 Owner's Manual page 4

Table of Contents

Advertisement

POSITIONING:
Position the dehumidifier unit in the center of the room to be conditioned if at
all possible. However if a damp patch is particularly apparent the outlet grille
should be pointed towards it.
NOTE: Both inlet grille and outlet grille of the dehumidifier unit must have
clear space around them and not be obstructed in anyway. For correct
installation and operation the unit inlet and outlet must have a clearance of
0.5M from all adjacent surfaces and or structures.
WIRING:
Connect the power mains cable to a 5 or 13 Amp power supply. As follows:-
DRAINAGE:
Connect a 12.5mm inside diameter hose to the condensate outlet pipe
(positioned centrally, beneath the air inlet grille). Secure the hose using a
worm drive clip. The hose should at no point be raised higher than the outlet
pipe. The hose should be ran to a permanent drain. Failure to observe this
requirement will result in flooding of the dehumidifier unit.
INSTALATION
Brown
Blue
Green/Yellow
Page 4 of 12
Drawing : - TPC148
Issue
: - 4
Date
: - 24/11/16
Live
Neutral
Earth (ground)

Advertisement

Table of Contents
loading

Table of Contents